logo
ProjectPending

Engro Fert LCY

Pending · Pakistan

Source: International Finance Corporation (IFC)

 The proposed IFC investment comprises of a Partial Guarantee (PCG) to be issued by IFC in favor or a commercial bank, which is providing a local currency loan to Engro Fertilizer Limited (Engro Fert or the “Company” - ). The use of proceeds is intended to finance: (i) permanent working capital and maintenance capital expenditure (CAPEX) for Engro Fert’s three exist

Status
Prospective
Sector
Water Supply and Storage, Natural Gas, Residential, Power Generation (CCGT), Hospital, Fertilizers, Hydrogen, Manufacturing (Industrial), Waste Processing and Treatment, Commercial, Government
Location
Pakistan
Updated
22 Jul 2026
Source
International Finance Corporation (IFC)

ConstructChat

Ask ConstructChat about Engro Fert LCY

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Engro Fert LCY” is an infrastructure initiative in the Water Supply and Storage sector, located in Pakistan. Taiyo aggregates data on it from International Finance Corporation (IFC).

Participants

Sponsoring Agency

Status

Original status

pending

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed IFC investment comprises of a Partial Guarantee (PCG) to be issued by IFC in favor or a commercial bank, which is providing a local currency loan to Engro Fertilizer Limited (Engro Fert or the “Company” - https://www.engrofertilizers.com). The use of proceeds is intended to finance: (i) permanent working capital and maintenance capital expenditure (CAPEX) for Engro Fert’s three existing fertilizer manufacturing plants, specifically the 'Base' and 'EnVen' plants located in Daharki, which have urea production capacities of 975 KT p.a. and 1,300 KT p.a., respectively, along with Zarkhez NPK plant in Port Qasim (Karachi) with a capacity of 100 KT p.a.; (ii) the EnVen turnaround in 2024, aimed at upgrading and maintaining the 'EnVen' urea plant to enhance its energy efficiency and operational reliability; and (iii) Engro Fert’s farmer outreach and advisory programs. The residential communities in proximity to the Engro fertilizer’ plants in Daharki include the Mari Gas residential colony and the Engro Fertilizer residential colony, which are adjacent to the south and southeastern boundaries of the plants, respectively, as well as approximately six local community villages with a buffer zone of 0.76 to 1.6 km from the plant. The Zarkhez NPK plant is located in the Eastern Industrial Zone (EIZ) of Port Qasim, a designated industrial and port area in the southern part of the Malir District. Port Qasim spans approximately 12,000 acres, primarily dedicated to industrial use, including zones like EIZ, NWIZ, and SWIZ, and houses facilities such as terminals, power plants, and manufacturing units. It is situated adjacent to Bin Qasim Town, an administrative subdivision and residential neighborhood located to the north of the port area. IFC has a long-standing relationship with Engro Fert, with previous investments including the Engro Retrofit & Expansion Project (#7554), Engro Corporate Project (#27933), and the Engro Pakistan Emergency Investment Facility Project (#30186). While previous investments have supported Engro Fert's growth, the E&S performance of some past projects, particularly Project #30186, did not achieve IFC PS compliance at exit in 2015. Engro Fert has significantly improved its E&S management system since then and has closed all pending PS gaps by 2019. This new investment aims to further strengthen Engro Fert’s E&S performance, aligning with IFC’s sustainability objectives.

Original sector

G-DA - Nitrogenous Fertilizer

Location

Country

Pakistan

Source

Source

International Finance Corporation (IFC)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Natural Gas, Residential, Power Generation (CCGT), Hospital, Fertilizers, Hydrogen, Manufacturing (Industrial), Waste Processing and Treatment, Commercial, Government

Article published date

2025-12-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project