Enguia Gen Power Plants
Sector: Geothermal • Location: Minas Gerais, Brazil
Source: World Bank Group
The project comprises the construction and operation of twelve thermal power plants (diesel) with total installed capacity of 240.9MW in the states of Piaui, Ceara, and Bahia. The company responsible for the project is Enguia Gen Ltda, a consortium of Brazilian companies led by Grupo Arbi.
The total investment in the project was estimated at US$130 million. In Ceara, seven plants were commiss
- Status
- Prospective
- Sector
- Geothermal, Power Generation (CCGT), Government, Commercial
- Location
- Minas Gerais, Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Enguia Gen Power Plants
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project comprises the construction and operation of twelve thermal power plants (diesel) with total installed capacity of 240.9MW in the states of Piaui, Ceara, and Bahia. The company responsible for the project is Enguia Gen Ltda, a consortium of Brazilian companies led by Grupo Arbi. The total investment in the project was estimated at US$130 million. In Ceara, seven plants were commissioned in April 2002: Pecem (13.1MW), Iguatu (13.1MW), Caucaia (13.1MW), Crato (13.1MW), Juazeiro do Norte (13.1MW), Aracati (11.45MW), and Baturite (11.45MW). The total investments in Ceara were estimated at US$47 million. In Piaui, four plants were commissioned in July 2002: Campo Maior (13MW), Altos (13MW), Marambaia (13MW), and Nazaria (13.1MW). In Bahia, the Jaguari power plant (100.4MW) was comissioned in June 2002. In January 2002, Enguia Gen signed a PPA with the Brazilian Commerce Chamber for Emergency Energy (CBEE), which is a two-year take-or-pay contract for the twelve plants. Enguia Gen’s power plants were part of a priority program for thermal power plants (Programa Prioritario de Termeletricas), implemented by the Brazilian federal government in 2000. The program, in order to foster the construction of thermal power plants, provided a short-term take-or-pay contract and, in some cases, financing for the construction of the plants (through the Brazilian Development Bank, BNDES). None None |
Original sector | Energy |
Budget |
Location
Country | Brazil |
State | Minas Gerais |
Source
Source reliability | High |
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Geothermal, Power Generation (CCGT), Government, Commercial |
Article published date | 2023-02-20 |
Research
Free account
View all details