logo

Enhance programmable logic controller (PLC) at the water treatment plant. Located at the Elk Lake water Treatment plant, 4 First Street which serves 245 houses

One of 10,000+ projects Taiyo tracks in Ontario.

Source: Infrastructure Canada

Project
Completed

Upgrades the Supervisory control and data acquisition (SCADA) system. Items within the Elk Lake water treatment plant programmable logic controller (PLC) enhancements will tie the filter PLC and high lift/low lift together into one system to enable full access to the water plant remotely for operators. Objective: Tie the two separate PLC’s together at the plant. This will make the entire plant ac

Status
Closed
Sector
Water Supply and Storage, Road, Government
Location
Ontario, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Enhance programmable logic controller (PLC) at the water treatment plant. Located at the Elk Lake water Treatment plant, 4 First Street which serves 245 houses

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Enhance programmable logic controller (PLC) at the water treatment plant. Located at the Elk Lake water Treatment plant, 4 First Street which serves 245 houses” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Upgrades the Supervisory control and data acquisition (SCADA) system. Items within the Elk Lake water treatment plant programmable logic controller (PLC) enhancements will tie the filter PLC and high lift/low lift together into one system to enable full access to the water plant remotely for operators. Objective: Tie the two separate PLC’s together at the plant. This will make the entire plant accessible by remote access and will enhance reliability of the system as a whole Scope: To design, create and install the hardware and software required to perform the above mentioned objective. Provide training to all staff on the new system and satisfy regulators. Output: The final product will be and integrated PLC at the water treatment plant fully functional, tested, licensed and training for staff on the new system

Original sector

Drinking Water and Wastewater

Location

Country

Canada

State

Ontario

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Road, Government

Article published date

2026-02-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project