Enhanced Oil Recovery from Kerogen-Rich Oil Shale Using Supercritical Water Injection
Sector: Water Supply and Storage
Source: Tech Xplore
A seven-year R&D project led by Skoltech researchers developed a method to convert solid organic matter (kerogen) in oil shale into extractable liquid oil by injecting supercritical water at high temperature and pressure into the rock 3 km underground. The method involves drilling two parallel horizontal boreholes for hot water injection and oil extraction, enabling efficient recovery and water re
- Status
- Under Construction
- Sector
- Water Supply and Storage, Oil and Gas
- Updated
- 22 Jul 2026
- Source
- Tech Xplore
ConstructChat
Ask ConstructChat about Enhanced Oil Recovery from Kerogen-Rich Oil Shale Using Supercritical Water Injection
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | ready for field testing |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A seven-year R&D project led by Skoltech researchers developed a method to convert solid organic matter (kerogen) in oil shale into extractable liquid oil by injecting supercritical water at high temperature and pressure into the rock 3 km underground. The method involves drilling two parallel horizontal boreholes for hot water injection and oil extraction, enabling efficient recovery and water reuse without chemicals. |
Original sector | Energy |
Location
| Not available for this record. |
Source
Source | Tech Xplore |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Oil and Gas |
Article published date | 2025-06-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- NE 148th Street Infiltration Facilities Project
- Vision Zero State Street Undercrossing Project
- SV 22-03 - FY 2021-2022 Annual Minor Streets Rehabilitation Program - CDBG
- SV 23-12 - FY 2023-24 Annual Major Streets Rehabilitation Program: Erringer Road
- SV 22-15 - FY 2021-2022 Annual Major Streets Rehabilitation Program: Cochran Street
