logo

Enhanced Reliability Through Short Time Resolution Data

Sector: Manufacturing (Industrial) • Location: Australia

Source: Australian Renewable Energy Agency (ARENA)

Project
Closed

Increased penetration of distributed energy resources (DER) are leaving power system operations vulnerable to the operating behaviour of a multitude of diverse, distributed generators.The Australian Energy Market Operator (AEMO) has identified a need for short time resolution data around voltage disturbances to understand DER behaviour and improve dynamic modelling. In this project, Solar Analytic

Project Information FAQ

Project Information

5 Q
The project “Enhanced Reliability Through Short Time Resolution Data” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Australia. Taiyo aggregates data on it from Australian Renewable Energy Agency (ARENA).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Increased penetration of distributed energy resources (DER) are leaving power system operations vulnerable to the operating behaviour of a multitude of diverse, distributed generators.The Australian Energy Market Operator (AEMO) has identified a need for short time resolution data around voltage disturbances to understand DER behaviour and improve dynamic modelling. In this project, Solar Analytics will work with AEMO (customer) and Wattwatchers (hardware/firmware) to develop automated data acquisition and delivery. The project aims to increase visibility and improve modelling capability in a world-first analysis of individual load and generator responses in the event of short time resolution voltage disturbances.Key resultsThis project aimed to help AEMO manage the transition to an energy system with a high proportion DER. Analysis of data collected through Wattwatchers monitoring devices has resulted in several outcomes of system relevance, including:A new voltage ride-through test which has been incorporated into the new Distributed Energy Resource (DER) technical standardsA change in constraints on the South-Australia – Victoria Heywood InterconnectorA recommendation for managing minimum operational demand in South Australia, which led to the South Australian Smarter Homes regulationsEngagement with inverter manufacturers to review settings in fielded systemsUpdates to system models, including more accurate contingency calculations based on more accurate understanding of DPV responseInitiation of a similar program of analysis in the South-West Interconnected System.The project findings have resulted in significant changes made by AEMO and complementary research programs will help AEMO manage the system without requiring severe limits on DER hosting capacity. It is expected that the probability of a major system outage due to unexpected impacts of DPV has been reduced through the changes made as a result of this project and associated research.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data