logo
ProjectProposed

Enhancing Sustainability: Financing for the Rogun Hydropower Project

Sector: Water Supply and Storage • Location: Tajikistan

Source: Asian Development Bank (ADB)

The Rogun Hydroelectric Power Plant (HPP) is a large project under construction located on the Vaksh river about 110km East-Northeast of Dushanbe in Tajikistan and, when completed, will be the most upstream power plant of total 6 HPPS on the Vakhsh River. It will have an installed capacity of 3,780 MW, a 335-meter-high dam, 13.3 km3 reservoir and expected annual generation of 14,400 GWh. The Rogun

Status
Prospective
Sector
Water Supply and Storage, Residential, Power Generation (CCGT), Commercial, Government, Education, Hydro
Location
Tajikistan
Updated
22 Jul 2026
Source
Asian Development Bank (ADB)

ConstructChat

Ask ConstructChat about Enhancing Sustainability: Financing for the Rogun Hydropower Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Enhancing Sustainability: Financing for the Rogun Hydropower Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Tajikistan. Taiyo aggregates data on it from Asian Development Bank (ADB).

Participants

Sponsoring Agency

Status

Original status

proposed

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Rogun Hydroelectric Power Plant (HPP) is a large project under construction located on the Vaksh river about 110km East-Northeast of Dushanbe in Tajikistan and, when completed, will be the most upstream power plant of total 6 HPPS on the Vakhsh River. It will have an installed capacity of 3,780 MW, a 335-meter-high dam, 13.3 km3 reservoir and expected annual generation of 14,400 GWh. The Rogun HPP was designed in the 1970s and after several start-and-stop cycles the project implementation was resumed in 2008 with financing from the Government of Tajikistan. The pace of construction has been impacted by the availability of financial resources and exposes the project to significant risks.The Rogun HPP will be the largest HPP in the region and has the potential to generate a multitude of benefits for Tajikistan and the broader Central Asia region. It can play an important role for Tajikistan's economy by providing reliable green electricity to meet growing demand at affordable cost, eliminating load shedding during winter months when supply cannot meet demand. In winter 2023-2024 50-70% of customers only had electricity for 6 to 10 hours daily. With the large reservoir it will be able to provide balancing services for the electricity network. The existing Vaksh river HPP cascade has been designed to withstand floods with a 10,000-year return period only. Today's best practice is to design large dams to withstand floods estimated on the probable maximum flood (PMF) concept. Such a PMF event would end disastrously if the existing HPPs are not upgraded on the cascade. The large reservoir in combination with the operating regime of the Rogun HPP will be able to protect all downstream powerplants from such a disastrous PMF event.At a regional level, the project is expected to export 70 percent of its total generation, providing a significant source of export revenue to Tajikistan and contributing to accelerated GDP growth. This can have positive impacts on the social, education and healthcare sector due to increased availability of public resources.

Original sector

Energy

Budget

Location

Country

Tajikistan

Source

Source

Asian Development Bank (ADB)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Residential, Power Generation (CCGT), Commercial, Government, Education, Hydro

Article published date

2025-01-14

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project