Ennen Subdivision Phase 1A & 1B Infrastructure
Sector: Commercial • Location: Rapid City, South Dakota, United States of America
Source: Dodge USA
This project consists of the development of 67 new residential housing lots being Phase 1A 1B of the Ennen Subdivision. The project work includes approximately 2,360 lf of water mains with hydrants and valves, approximately 2,455 lf of sanitary sewer mains with manholes, approximately, 1,970 lf of storm sewer with inlets, approximately 4,165 lf of edge drain, approximately 2,100 lf of paved street
- Status
- Closed
- Sector
- Commercial, Water Supply and Storage, Car parking, Power Transmission, Road, Waste Processing and Treatment, Residential, Bridge, Automotive, Power Generation (CCGT)
- Location
- Rapid City, South Dakota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Ennen Subdivision Phase 1A & 1B Infrastructure
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project consists of the development of 67 new residential housing lots being Phase 1A 1B of the Ennen Subdivision. The project work includes approximately 2,360 lf of water mains with hydrants and valves, approximately 2,455 lf of sanitary sewer mains with manholes, approximately, 1,970 lf of storm sewer with inlets, approximately 4,165 lf of edge drain, approximately 2,100 lf of paved street with curb and gutter and 2,245 sf of sidewalks and trenching for typical dry utility installation. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Dakota |
City | Rapid City |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Car parking, Power Transmission, Road, Waste Processing and Treatment, Residential, Bridge, Automotive, Power Generation (CCGT) |
Article published date | 2024-06-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
