Ennore container terminal PPP project
Project awarded · India
Source: InfraPPPWorld
The concession will be awarded on a design, build,finance, operate and transfer (DBFOT) basis for a period of 30 years. The terminal will have a quay length of 730 metres and an estimated throughput of 1.4 million TEUs annually.
- Status
- Closed
- Sector
- Seaport
- Location
- India
- Updated
- 22 Jul 2026
- Source
- InfraPPPWorld
ConstructChat
Ask ConstructChat about Ennore container terminal PPP project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | project awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The concession will be awarded on a design, build,finance, operate and transfer (DBFOT) basis for a period of 30 years. The terminal will have a quay length of 730 metres and an estimated throughput of 1.4 million TEUs annually. |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | India |
Source
Source | InfraPPPWorld |
URL |
More Details
Record type | Project |
Sector | Seaport |
Article published date | 2025-03-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
