ENOS House - Phase III Improvements
Sector: Water Supply and Storage • Location: Santa Maria, California, United States of America
Source: Dodge
The project scope of work is the construction of site improvements for the Enos Ranchos Historical House Park, located at 900 Shepard Drive in the City of Santa Maria. Improvements include grading, utility installation, and construction of hardscape features such as 4-inch concrete paving, concrete steps, ADA-accessible ramps, mow curbs, truncated domes, parking lot striping and signage, asphalt p
- Status
- Prospective
- Sector
- Water Supply and Storage, Cement, Government, Road, Power Generation (CCGT), Power Transmission, Commercial, Car parking, Automotive, Manufacturing (Industrial)
- Location
- Santa Maria, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about ENOS House - Phase III Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project scope of work is the construction of site improvements for the Enos Ranchos Historical House Park, located at 900 Shepard Drive in the City of Santa Maria. Improvements include grading, utility installation, and construction of hardscape features such as 4-inch concrete paving, concrete steps, ADA-accessible ramps, mow curbs, truncated domes, parking lot striping and signage, asphalt paving, and wheel stops. Additional elements consist of electrical infrastructure, including condu... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Santa Maria |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Government, Road, Power Generation (CCGT), Power Transmission, Commercial, Car parking, Automotive, Manufacturing (Industrial) |
Article published date | 2025-09-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
