logo

enso Albania

Sector: Tunnel • Location: Albania

Source: International Finance Corporation (IFC)

Project
Completed

The proposed project is an early stage equity investment in a holding company in Albania (the “Company”) to be established by Enso Hydro GmbH (“Enso” or the “Sponsor”), an Austrian company specializing in investments in small hydro projects with up to 15MW capacity (the “Project”). IFC’s investment will be an up to EUR 6 million equity investment for up to 20% of the share capital of the Company.

Project Information FAQ

Project Information

5 Q
The project “enso Albania” is an infrastructure initiative in the Tunnel sector, located in Albania. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed project is an early stage equity investment in a holding company in Albania (the “Company”) to be established by Enso Hydro GmbH (“Enso” or the “Sponsor”), an Austrian company specializing in investments in small hydro projects with up to 15MW capacity (the “Project”). IFC’s investment will be an up to EUR 6 million equity investment for up to 20% of the share capital of the Company. One 8.9MW hydro power plant on the river Lengarica has already been identified and the concession is signed and a concession for a cascade of 5 small hydro projects with a total installed capacity of 29.8MW on the river Mati has been awarded and ready to be signed. 1 to 2 further small hydro projects will be acquired and developed in the future, however these are not identified yet.Note: Enso Hydro GmbH has a minimal staff as most of the services (including technical and environment) are being provided by Enso GmbH, which is different from Enso Hydro GmbH. Lengarica hydropower project (a 8.9MW run-of-the-river type hydropower plant) will be built at the lower part of the Lengarica river basin in Permet district, Gjirokaster prefecture. It will be situated in a hilly and mountainous terrain, in Banja’s Canyon zone at the elevation of 410m above sea level, about 7 km from Vjosa river. The project will consist of a regulator (“side intake” type, opening for ecological flow, about 13m height and 60m length), about 4 km tunnel (concrete lining, 2.4m width, 4m height), a forebay (concrete basin to collect the water coming from the tunnel), about 3.7 km penstock (6 river crossings), a power house (8.9MW), and about 6.5 km 35kV transmission line to Permet substation. Mati hydropower project is a cascade of five small hydropower plants with a total capacity of 29.8MW : 2 diversion hydropower plants (5.9MW and 12.3MW) in the upstream area and 3 run-of-the-river type hydropower plants (4.5MW, 3.85MW, and 3.2MW) in the downstream area of Mati river basin in the Mat region. This is still a concept stage without detailed design specifications.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data