Enterprise Sea Port Oil Terminal (SPOT)
Sector: Water Supply and Storage • Location: Freeport, Texas, United States of America
Source: Dodge USA
Deep-water offshore terminal to load up to 85,000 barrels of oil per hour, to fully load 2 million barrels in under 1 day, with a fixed-platform port marine terminal connected by two 36-in., bi-directional crude pipelines running from the port to the onshore storage facility. Includes building additional storage tanks. Project will accommodate Very Large Crude Carriers (VLCC) and other crude oil t
- Status
- Prospective
- Sector
- Water Supply and Storage, Seaport, Commercial, Oil and Gas, Chemical (Industrial), Manufacturing (Industrial)
- Location
- Freeport, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Enterprise Sea Port Oil Terminal (SPOT)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Deep-water offshore terminal to load up to 85,000 barrels of oil per hour, to fully load 2 million barrels in under 1 day, with a fixed-platform port marine terminal connected by two 36-in., bi-directional crude pipelines running from the port to the onshore storage facility. Includes building additional storage tanks. Project will accommodate Very Large Crude Carriers (VLCC) and other crude oil tankers, that can carry 2 million barrels of crude oil in a single shipment. |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Freeport |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Seaport, Commercial, Oil and Gas, Chemical (Industrial), Manufacturing (Industrial) |
Article published date | 2024-11-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
