Environmental Industrial Services Inc. (EISI) - Brudenell Wastewater Treatment System Upgrades
Sector: Water Supply and Storage • Location: Prince Edward Island, Canada
Source: Infrastructure Canada
The project consists of upgrades to the Brudenell Wastewater Treatment System. It upgrades an aging system, making it more cost effective to run and eliminating a point load discharge from a shellfish harvesting area. The scope of the work includes the addition of a new lift station, two new settling ponds, revisions to the concrete reactor chambers, rejuvenating the exterior of the existing plant
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | pre-construction |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project consists of upgrades to the Brudenell Wastewater Treatment System. It upgrades an aging system, making it more cost effective to run and eliminating a point load discharge from a shellfish harvesting area. The scope of the work includes the addition of a new lift station, two new settling ponds, revisions to the concrete reactor chambers, rejuvenating the exterior of the existing plant building, rejuvenating the system process piping valving, aeration piping and system controls, and cut and cap of the discharge pipe to the Brudenell River. The project aims to rejuvenate the existing infrastructure, reduce the ongoing operational work and associated costs involved in hauling sludge, remove a point load discharge from the river to make facility "Zero Discharge", reduce the potential for contamination to the shellfish harvesting area, and eliminate the requirement for a joint management plan between the various stakeholders which allows EISI to operate the facility in a shellfish harvesting area. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
