logo

Environmental Industrial Services Inc. (EISI) - Brudenell Wastewater Treatment System Upgrades

Sector: Waste Processing and Treatment • Location: Prince Edward Island, Canada

Source: Infrastructure Canada

Project
Pre-Construction

The project consists of upgrades to the Brudenell Wastewater Treatment System. It upgrades an aging system, making it more cost effective to run and eliminating a point load discharge from a shellfish harvesting area. The scope of the work includes the addition of a new lift station, two new settling ponds, revisions to the concrete reactor chambers, rejuvenating the exterior of the existing plant

Status
Prospective
Sector
Waste Processing and Treatment, Water Supply and Storage, Manufacturing (Industrial), Nuclear, Commercial, Cement
Location
Prince Edward Island, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Environmental Industrial Services Inc. (EISI) - Brudenell Wastewater Treatment System Upgrades

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Environmental Industrial Services Inc. (EISI) - Brudenell Wastewater Treatment System Upgrades” is an infrastructure initiative in the Waste Processing and Treatment sector, located in Prince Edward Island, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Not available for this record.

Status

Original status

pre-construction

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project consists of upgrades to the Brudenell Wastewater Treatment System. It upgrades an aging system, making it more cost effective to run and eliminating a point load discharge from a shellfish harvesting area. The scope of the work includes the addition of a new lift station, two new settling ponds, revisions to the concrete reactor chambers, rejuvenating the exterior of the existing plant building, rejuvenating the system process piping valving, aeration piping and system controls, and cut and cap of the discharge pipe to the Brudenell River. The project aims to rejuvenate the existing infrastructure, reduce the ongoing operational work and associated costs involved in hauling sludge, remove a point load discharge from the river to make facility "Zero Discharge", reduce the potential for contamination to the shellfish harvesting area, and eliminate the requirement for a joint management plan between the various stakeholders which allows EISI to operate the facility in a shellfish harvesting area.

Original sector

Drinking Water and Wastewater

Location

Country

Canada

State

Prince Edward Island

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Waste Processing and Treatment, Water Supply and Storage, Manufacturing (Industrial), Nuclear, Commercial, Cement

Article published date

2026-05-31

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project