ENVIRONMENTAL INFRASTRUCTURE PROJECT
Sector: Water Supply and Storage • Location: Moldova
Source: World Bank Group
The key development objectives of the Environmental Infrastructure Project for Moldova are: (i) improve the quality of sanitation services in Soroca; (ii) reduce the discharge of pollutants, including nutrients, from Soroca municipal sources that flow into the Nistru River and, subsequently, into the Black Sea; and (iii) demonstrate viable nutrient reduction strategies and technologies from munici
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The key development objectives of the Environmental Infrastructure Project for Moldova are: (i) improve the quality of sanitation services in Soroca; (ii) reduce the discharge of pollutants, including nutrients, from Soroca municipal sources that flow into the Nistru River and, subsequently, into the Black Sea; and (iii) demonstrate viable nutrient reduction strategies and technologies from municipal sources for the benefit of Moldova and Black Sea region. There are 4 components to the Project. Component 1 is made up of 2 sub-components: Component 1-A is the Wastewater management in Soroca, which will finance: (i) the rehabilitation of wastewater collection system, necessary sewerage pressure pipelines and the construction of wastewater treatment facility using constructed wetlands technology for the municipality of Soroca; and (ii six months' operations of the facility in order to train the Apa Canal staff in the proper operations and maintenance of the facility; Component 1-B, Engineering Consultant and TA, will support: (i) Engineering services for wastewater treatment plant (WWTP) and sewer network design, procurement, supervision support, and a six months' operational assistance for WWTP; and (ii) Feasibility studies for 10 towns and pre-feasibility studies for an additional 5 towns, including replication of constructed wetland system in the studies. Component 2, Dissemination and Replication Component related to Constructed Wetlands, will target the dissemination of experience and knowledge obtained from operation of the new Soroca WWTP. Component 3, Institutional Strengthening Component, will finance: (i) the development of a communication strategy and capacity building for media campaign and community and civil- society outreach to prepare for the necessary increase of a sewage treatment surcharge; and (ii) Apa Canal staff training for operational efficiency improvements. Component 4 is Project Management, which will support management and implementation of the project, including auditing services, by the Project Implementing Unit (PIU) in the Agency for Construction and Territorial Development (ACTD). |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
