logo
ProjectClosed

ENVIRONMENTAL INFRASTRUCTURE PROJECT

Closed · Moldova

Source: World Bank Group

The key development objectives of the Environmental Infrastructure Project for Moldova are: (i) improve the quality of sanitation services in Soroca; (ii) reduce the discharge of pollutants, including nutrients, from Soroca municipal sources that flow into the Nistru River and, subsequently, into the Black Sea; and (iii) demonstrate viable nutrient reduction strategies and technologies from munici

Status
Closed
Sector
Water Supply and Storage, Fertilizers, Waste Processing and Treatment, Commercial, Rail, Government
Location
Moldova
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about ENVIRONMENTAL INFRASTRUCTURE PROJECT

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “ENVIRONMENTAL INFRASTRUCTURE PROJECT” is an infrastructure initiative in the Water Supply and Storage sector, located in Moldova. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The key development objectives of the Environmental Infrastructure Project for Moldova are: (i) improve the quality of sanitation services in Soroca; (ii) reduce the discharge of pollutants, including nutrients, from Soroca municipal sources that flow into the Nistru River and, subsequently, into the Black Sea; and (iii) demonstrate viable nutrient reduction strategies and technologies from municipal sources for the benefit of Moldova and Black Sea region. There are 4 components to the Project. Component 1 is made up of 2 sub-components: Component 1-A is the Wastewater management in Soroca, which will finance: (i) the rehabilitation of wastewater collection system, necessary sewerage pressure pipelines and the construction of wastewater treatment facility using constructed wetlands technology for the municipality of Soroca; and (ii six months' operations of the facility in order to train the Apa Canal staff in the proper operations and maintenance of the facility; Component 1-B, Engineering Consultant and TA, will support: (i) Engineering services for wastewater treatment plant (WWTP) and sewer network design, procurement, supervision support, and a six months' operational assistance for WWTP; and (ii) Feasibility studies for 10 towns and pre-feasibility studies for an additional 5 towns, including replication of constructed wetland system in the studies. Component 2, Dissemination and Replication Component related to Constructed Wetlands, will target the dissemination of experience and knowledge obtained from operation of the new Soroca WWTP. Component 3, Institutional Strengthening Component, will finance: (i) the development of a communication strategy and capacity building for media campaign and community and civil- society outreach to prepare for the necessary increase of a sewage treatment surcharge; and (ii) Apa Canal staff training for operational efficiency improvements. Component 4 is Project Management, which will support management and implementation of the project, including auditing services, by the Project Implementing Unit (PIU) in the Agency for Construction and Territorial Development (ACTD).

Original sector

FY17 - Public Administration,FY17 - Water, Sanitation and Waste Management

Budget

Location

Country

Moldova

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Fertilizers, Waste Processing and Treatment, Commercial, Rail, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project