logo

ENVIRONMENTAL INFRASTRUCTURE PROJECT

Sector: Water Supply and Storage • Location: Moldova

Source: World Bank Group

Project
Closed

The key development objectives of the Environmental Infrastructure Project for Moldova are: (i) improve the quality of sanitation services in Soroca; (ii) reduce the discharge of pollutants, including nutrients, from Soroca municipal sources that flow into the Nistru River and, subsequently, into the Black Sea; and (iii) demonstrate viable nutrient reduction strategies and technologies from munici

Project Information FAQ

Project Information

5 Q
The project “ENVIRONMENTAL INFRASTRUCTURE PROJECT” is an infrastructure initiative in the Water Supply and Storage sector, located in Moldova. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The key development objectives of the Environmental Infrastructure Project for Moldova are: (i) improve the quality of sanitation services in Soroca; (ii) reduce the discharge of pollutants, including nutrients, from Soroca municipal sources that flow into the Nistru River and, subsequently, into the Black Sea; and (iii) demonstrate viable nutrient reduction strategies and technologies from municipal sources for the benefit of Moldova and Black Sea region. There are 4 components to the Project. Component 1 is made up of 2 sub-components: Component 1-A is the Wastewater management in Soroca, which will finance: (i) the rehabilitation of wastewater collection system, necessary sewerage pressure pipelines and the construction of wastewater treatment facility using constructed wetlands technology for the municipality of Soroca; and (ii six months' operations of the facility in order to train the Apa Canal staff in the proper operations and maintenance of the facility; Component 1-B, Engineering Consultant and TA, will support: (i) Engineering services for wastewater treatment plant (WWTP) and sewer network design, procurement, supervision support, and a six months' operational assistance for WWTP; and (ii) Feasibility studies for 10 towns and pre-feasibility studies for an additional 5 towns, including replication of constructed wetland system in the studies. Component 2, Dissemination and Replication Component related to Constructed Wetlands, will target the dissemination of experience and knowledge obtained from operation of the new Soroca WWTP. Component 3, Institutional Strengthening Component, will finance: (i) the development of a communication strategy and capacity building for media campaign and community and civil- society outreach to prepare for the necessary increase of a sewage treatment surcharge; and (ii) Apa Canal staff training for operational efficiency improvements. Component 4 is Project Management, which will support management and implementation of the project, including auditing services, by the Project Implementing Unit (PIU) in the Agency for Construction and Territorial Development (ACTD).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data