Enzi Practice Fields Improvements
Gc bidding · Wyoming · Last reported Oct 2024
Source: Dodge USA
Base Bid Improvements to the existing practice fields along Enzi Dr, including, new infield materials, irrigated grass outfields, additional fencing, parking lot improvements, gravel pathway from Shoshone Ave. to within the field complex, and electrical (all conduit, junction boxes, backstop receptacles, pedestal, service connections, primary and secondary, power to irrigation controller). Additiv
- Status
- Under Construction
- Sector
- Power Generation (CCGT), Car parking, Government, Water Supply and Storage, Automotive, Manufacturing (Industrial), Commercial
- Location
- Gillette, Wyoming, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Enzi Practice Fields Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Base Bid Improvements to the existing practice fields along Enzi Dr, including, new infield materials, irrigated grass outfields, additional fencing, parking lot improvements, gravel pathway from Shoshone Ave. to within the field complex, and electrical (all conduit, junction boxes, backstop receptacles, pedestal, service connections, primary and secondary, power to irrigation controller). Additive Alternate A Provide parking lot lighting and field lighting Additive Alternate B Provide 20 x30... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wyoming |
City | Gillette |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Car parking, Government, Water Supply and Storage, Automotive, Manufacturing (Industrial), Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
