EOHLC Bath Reno & Waste Pipe Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
The complete reno of two bathrooms, abatement and proper disposal of ACM and the replacement of the full run of all bathroom and kitchen waste pipes to the basement. Also included in this project is the abatement and proper disposal of ACM
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Commercial, Waste Processing and Treatment, Residential
- Location
- Boston, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about EOHLC Bath Reno & Waste Pipe Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The complete reno of two bathrooms, abatement and proper disposal of ACM and the replacement of the full run of all bathroom and kitchen waste pipes to the basement. Also included in this project is the abatement and proper disposal of ACM |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Waste Processing and Treatment, Residential |
Article published date | 2025-08-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
