Eolico Amayo Wind Farm (Phase II)

Sector: Natural Gas • Location: Nicaragua

Source: World Bank Group

Project
Active

In November 2010, Consorcio Eolico Amayo (Fase II) SA closed finacing for the 23.1 MW second phase of a wind farm in the Rivas department of Nicaragua. Amayo II consisted of eleven 2.1 MW Suzlon S88 50HZ wind turbines and had an installed capacity of 23.1 MW; it was the second phase of Eolico Amayo, a 39.9MW wind farm owned by the same shareholders under a different project company. The original d

Status
Prospective
Sector
Natural Gas, Wind, Government, Power Generation (CCGT), Raw Materials, Commercial
Location
Nicaragua
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Eolico Amayo Wind Farm (Phase II)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Eolico Amayo Wind Farm (Phase II)” is an infrastructure initiative in the Natural Gas sector, located in Nicaragua. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In November 2010, Consorcio Eolico Amayo (Fase II) SA closed finacing for the 23.1 MW second phase of a wind farm in the Rivas department of Nicaragua. Amayo II consisted of eleven 2.1 MW Suzlon S88 50HZ wind turbines and had an installed capacity of 23.1 MW; it was the second phase of Eolico Amayo, a 39.9MW wind farm owned by the same shareholders under a different project company. The original developer of the project was Arctas Capital, which sold 47.5% of the project to Ashmore Energy International in May 2010, bringing AEI's stake in each phase to 61.3%. Centrans and local investors owned the remainder of the project's equity. The project company entered into two 15-year PPAs with Dissur and Disnorte, private power companies owned by Gas Natural, for 100% of the energy generated. The total cost of the project was USD 55 million, including a USD 45 million project financing facility. The facility consisted of a $42 million Senior Loan and a $3 million Mezzanine Loan. Senior Loan participants include CABEI, FMO, the Danish Export Credit Agency (EKF) and the Belgian Investment Company for Developing Countries (BIO). The Mezzanine Loan was provided by the Access to Energy Fund, which FMO manages on behalf of the Dutch government (Ministry of Foreign Affairs, Directorate General International Cooperation). The project was scheduled to begin operations in 2011 and had applied for accreditation through the CDM mechanism. In March 2014, Inkia Energy, a subsidiary of the Israeli company IC Power (Israel Corp.), acquired AEI's stake in the project.

Original sector

Energy

Budget

Location

Country

Nicaragua

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Natural Gas, Wind, Government, Power Generation (CCGT), Raw Materials, Commercial

Article published date

2024-05-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project