logo
ProjectActive

Eolo Wind Farm

One of 2,146 projects Taiyo tracks in Nicaragua.

Source: Multilateral Investment Guarentee Agency (MIGA)

On August 10, 2012, MIGA issued guarantees of $16.3 million to Globeleq Mesoamérica Energy (Wind) Limited of Bermuda[1] to cover its equity investment in Eolo Wind Farm in Nicaragua. The coverage is for a period of up to 20 years against the risks of transfer restriction, expropriation, and war and civil disturbance. The Eolo project involves the construction of a 44 megawatt wind farm in Rivas P

Status
Prospective
Sector
Geothermal, Natural Gas, Oil and Gas, Wind, Power Generation (CCGT), Power Transmission, Raw Materials, Government, Manufacturing (Industrial)
Location
Nicaragua
Updated
19 Nov 2026
Source
Multilateral Investment Guarentee Agency (MIGA)

ConstructChat

Ask ConstructChat about Eolo Wind Farm

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Eolo Wind Farm” is an infrastructure initiative in the Geothermal sector, located in Nicaragua. Taiyo aggregates data on it from Multilateral Investment Guarentee Agency (MIGA).

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

On August 10, 2012, MIGA issued guarantees of $16.3 million to Globeleq Mesoamérica Energy (Wind) Limited of Bermuda[1] to cover its equity investment in Eolo Wind Farm in Nicaragua. The coverage is for a period of up to 20 years against the risks of transfer restriction, expropriation, and war and civil disturbance. The Eolo project involves the construction of a 44 megawatt wind farm in Rivas Province on the shores of Lake Nicaragua. Eolo consists of 22 Gamesa G90 2 megawatt wind turbine generators, as well as the facilities and equipment required to connect the generators to a high-voltage substation. It is estimated that Eolo will be able to generate approximately 169.6 gigawatt hours of electricity per year, without requiring any fossil fuel supply. The wind farm is expected to start operations by December of 2012 and the electricity will be purchased by local distribution companies Distribuidora de Electricidad del Norte, S.A. (Disnorte) and Distribuidora de Electricidad del Sur, S.A. (Dissur). Nicaragua's electrification rate is among the lowest in Central America. Additionally, reliance on thermal (oil-fired) generating plants has made the long-term marginal costs the highest in the region. This project aims to provide additional generation capacity that is not only renewable and clean, but also helps reduce the average marginal cost of generation, resulting in an overall reduced cost of electricity to users. MIGA's participation in the project is aligned with the agency's commitment to support investment into into countries eligible for concessional lending from the International Development Association and investment in infrastructure. [1] In June 2017, Globeleq Mesoamerica Energy (Wind) Limited of Bermuda as a Guarantee Holder was replaced by Investment Energy Resources Limited.

Original sector

Power

Budget

Location

Country

Nicaragua

Source

Source reliability

High

Source

Multilateral Investment Guarentee Agency (MIGA)

URL

More Details

Record type

Project

Sector

Geothermal, Natural Gas, Oil and Gas, Wind, Power Generation (CCGT), Power Transmission, Raw Materials, Government, Manufacturing (Industrial)

Article published date

2023-02-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project