EPBIH Solar Transition Programme
The status, timeline and source of this project. A free account opens every field.
Source: European Bank for Reconstruction and Development (EBRD)
EBRD secured senior loan of €50 million to public electricity generation utility JP Elektroprivreda Bosne i Hercegovine d.d. Sarajevo ("EPBiH" or the "Company") for the development, construction, and operation of eight solar photovoltaic plants (85MWp in total) located at Zivnice, Mostar and Breza (the "Project"). The total financing will be sized to cover the estimated €80.8 million capex of the
- Status
- Prospective
- Sector
- Solar, Water Supply and Storage, Metal, Hydro, Geothermal, Wind, Consumer Products, Warehouse, Raw Materials, Power Generation (CCGT), Residential, Power Transmission, Commercial, Government
- Location
- Bosnia and Herzegovina
- Updated
- 19 Nov 2026
- Source
- European Bank for Reconstruction and Development (EBRD)
ConstructChat
Ask ConstructChat about EPBIH Solar Transition Programme
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | passed final review, pending approval |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | EBRD secured senior loan of €50 million to public electricity generation utility JP Elektroprivreda Bosne i Hercegovine d.d. Sarajevo ("EPBiH" or the "Company") for the development, construction, and operation of eight solar photovoltaic plants (85MWp in total) located at Zivnice, Mostar and Breza (the "Project"). The total financing will be sized to cover the estimated €80.8 million capex of the project as well as the costs of lenders' advisors and is expected to be co-financed by EBRD and a commercial bank via a parallel loan. The Project will be procured and financed in two tranches: i) first tranche will include three solar photovoltaic plants (Gornja Breza, Visca, Podvelezje - 28 MWp in total) and ii) second tranche will include five solar photovoltaic plants (Bedrok 1,2 & 3, Banovici Selo, Potocari - 57 MWp in total). The Project benefits from a first loss risk cover from the European Fund for Sustainable Development plus (EFSD+) Hi-Bar guarantee programme. The programme contributes to economies in the European Neighbourhood by supporting sustainable investments in energy transition. |
Original sector | Energy |
Budget |
Location
Country | Bosnia and Herzegovina |
Source
Source | European Bank for Reconstruction and Development (EBRD) |
URL |
More Details
Record type | Project |
Sector | Solar, Water Supply and Storage, Metal, Hydro, Geothermal, Wind, Consumer Products, Warehouse, Raw Materials, Power Generation (CCGT), Residential, Power Transmission, Commercial, Government |
Article published date | 2025-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
