logo

EPC 14 - SH 79 - Upgradation of Tiruchengode - Erode SH-79 Road to Four Lane with Paved Shoulders.

Sector: Bridge • Location: Namakkal, Tamil Nadu, India

Source: India Investment Grid (IIG)

Project
Closed

Information Chennai Kanyakumari Industrial Corridor Project wing of Highways Department of Tamil Nadu. has come up with EPC 14 - SH 79 - Upgradation of Tiruchengode - Erode SH-79 Road to Four Lane with Paved Shoulders. with a ticket size of 199.6 INR Crores. This project in Roads & Bridges sub-sector involves Upgradation or Widening of Road/Bridge/Underpass/Tunnel The current status of the projec

Project Information FAQ

Project Information

5 Q
The project “EPC 14 - SH 79 - Upgradation of Tiruchengode - Erode SH-79 Road to Four Lane with Paved Shoulders.” is an infrastructure initiative in the Bridge sector, located in Namakkal, Tamil Nadu, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Information Chennai Kanyakumari Industrial Corridor Project wing of Highways Department of Tamil Nadu. has come up with EPC 14 - SH 79 - Upgradation of Tiruchengode - Erode SH-79 Road to Four Lane with Paved Shoulders. with a ticket size of 199.6 INR Crores. This project in Roads & Bridges sub-sector involves Upgradation or Widening of Road/Bridge/Underpass/Tunnel The current status of the project is Work in Progress and is being developed through the EPC route. Economic/Social Impact of the Project Upgrading of Malliyakarai Rasipuram Tiruchengode Erode Road [SH 79] from km 83/350 to km 91/100 to Four lane with paved shoulders Construction of Two Lane Elevated Corridor from Ch. 91/100 to Km 94/170 including Service road on either side providing ramp to Sankagiri Pallipalayam Road from km 15/367 to km 15/700 [Design Chainage 0/000 to 0/333] maintenance of entire project stretch of 11.153 km for a period of 7 years in the State of Tamil Nadu on Engineering, Procurement Construction mode

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data