EPCG Metering and Distribution Project
Repaying · Montenegro
Source: European Bank for Reconstruction and Development (EBRD)
In 2010, the Bank approved a corporate loan facility to EPCG of up to EUR 35,000,000 to address the high level of losses (up to 23% in 2009) and the low level of collections in the distribution network, as well as to improve energy efficiency and demand side management. As of 2013, the implementation has been ongoing in line with the plan and the achieved results have been very encouraging. As a r
- Status
- Under Construction
- Sector
- Power Generation (CCGT), Power Transmission, Government, Commercial, Residential
- Location
- Montenegro
- Updated
- 22 Jul 2026
- Source
- European Bank for Reconstruction and Development (EBRD)
ConstructChat
Ask ConstructChat about EPCG Metering and Distribution Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | repaying |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In 2010, the Bank approved a corporate loan facility to EPCG of up to EUR 35,000,000 to address the high level of losses (up to 23% in 2009) and the low level of collections in the distribution network, as well as to improve energy efficiency and demand side management. As of 2013, the implementation has been ongoing in line with the plan and the achieved results have been very encouraging. As a result, EPCG expressed the intention to expand the scope of the smart-metering roll-out and extend the amount of the EBRD loan. Responding to the Company's request, an extension of the existing loan to the Company was approved in April 2013 by the EBRD Board in the amount of up to EUR 30,000,000. The loan extension will be used to expand the scope of the implementation and install additional 97,000 meters. These measures will support the on-going transition of the Company to an independent commercial entity, and will result in all household consumers in the country switching to smart meters. |
Original sector | Energy |
Budget |
Location
Country | Montenegro |
Source
Source | European Bank for Reconstruction and Development (EBRD) |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Power Transmission, Government, Commercial, Residential |
Article published date | 2026-06-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in Montenegro
- Coastal cities water utility management contract
- Montenegro Mozura Wind Farm
- Krnovo Wind Farm
- POWER SECTOR RECONSTRUCTION
- Elektroprivreda Crne Gore AD Niksic
- Green jobs for better future of cross-border region of Montenegro and Kosovo
- Local cuisine as tourism offer of cross-border region
- Cross border joint initiatives for better waste management
