Epic Central Maintenance Building
Sector: Automotive • Location: Grand Prairie, Texas, United States of America
Source: Dodge USA
he EPIC Center Maintenance Building will be located at 2950 Fall Drive. The Maintenance Building will be metal building construction approximately 30 x76 , and includes maintenance garage, office, break/training room, toilet, and storage rooms. Site improvements will include concrete paving, landscape/irrigation, and fencing with operable gate. SCOPE OF WORK Scope of work is outlined and detailed
- Status
- Closed
- Sector
- Automotive, Metal, Water Supply and Storage, Cement, Commercial, Rail, Residential, Car parking, Government, Manufacturing (Industrial)
- Location
- Grand Prairie, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Epic Central Maintenance Building
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | notice of completion |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | he EPIC Center Maintenance Building will be located at 2950 Fall Drive. The Maintenance Building will be metal building construction approximately 30 x76 , and includes maintenance garage, office, break/training room, toilet, and storage rooms. Site improvements will include concrete paving, landscape/irrigation, and fencing with operable gate. SCOPE OF WORK Scope of work is outlined and detailed in the construction documents and specifications provided and generally consists of the following... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Grand Prairie |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Automotive, Metal, Water Supply and Storage, Cement, Commercial, Rail, Residential, Car parking, Government, Manufacturing (Industrial) |
Article published date | 2023-07-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Automotive projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- MARTA INTELLIGENT TRANSPORTATION SYSTEM (FLEET AVLS)/DEKALB
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
