Epoxy Pool Deck
Sector: Commercial • Location: Rudyard, Michigan, United States of America
Source: Dodge
Mechanically abrade the surface of the pool deck and storage rooms, approx. 3700 sq ft (field verify) covering the existing tile with an quartz epoxy coating where the tile grout lines will not show up through the epoxy. Replace lettering and depth markings around pool deck as required by MI code
- Status
- Closed
- Sector
- Commercial, Manufacturing (Industrial), Residential, Road, Government
- Location
- Rudyard, Michigan, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Epoxy Pool Deck
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Mechanically abrade the surface of the pool deck and storage rooms, approx. 3700 sq ft (field verify) covering the existing tile with an quartz epoxy coating where the tile grout lines will not show up through the epoxy. Replace lettering and depth markings around pool deck as required by MI code |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Michigan |
City | Rudyard |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Commercial, Manufacturing (Industrial), Residential, Road, Government |
Article published date | 2025-02-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- I-20 FROM CARROLL COUNTY LINE TO 0.15 MI E OF SR 5
- SR 22 SPUR FROM 0.23 MI W OF CR 2111/REESE ROAD TO SR 22
- RELOC & STORE 121 BRIDGE BEAMS/529 R-E PANELS/PRES.PKWY
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
- I-90 eastgate to sr 900
