logo
ProjectComplete

EPS Metering

One of 3,021 projects Taiyo tracks in Serbia.

Source: European Bank for Reconstruction and Development (EBRD)

EBRD is considering a sovereign guaranteed loan of up to EUR 40,000,000, to Elektroprivreda Srbije ("EPS") in parallel with a similar loan of EUR 40,000,000 from the EIB (in total EUR 80,000,000) to finance the purchase and installation of modern electricity meters and the associated infrastructure and software in the Serbian electricity distribution system. These measures will target the existing

Status
Closed
Sector
Government, Power Generation (CCGT), Residential, Waste Processing and Treatment
Location
Serbia
Updated
22 Jul 2026
Source
European Bank for Reconstruction and Development (EBRD)

ConstructChat

Ask ConstructChat about EPS Metering

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “EPS Metering” is an infrastructure initiative in the Government sector, located in Serbia. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Participants

Sponsoring Agency

Status

Original status

complete

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

EBRD is considering a sovereign guaranteed loan of up to EUR 40,000,000, to Elektroprivreda Srbije ("EPS") in parallel with a similar loan of EUR 40,000,000 from the EIB (in total EUR 80,000,000) to finance the purchase and installation of modern electricity meters and the associated infrastructure and software in the Serbian electricity distribution system. These measures will target the existing level of electricity losses in the network with the aim of significantly reducing these losses over the project implementation period. They will also assist in increasing bill collection rates. The transition impact of the project stems primarily from the following: Elektroprivreda Srbije, the vertically integrated electricity company of Serbia, owned 100% by the Government of the Republic of Serbia. A sovereign guaranteed loan of up to EUR 40,000,000. EUR 80,000,000. The Project has been categorised B under EBRD's Environmental and Social Policy (2008), requiring an Environmental and Social Due Diligence ("ESDD"). The ESDD was undertaken by an international independent consultant consisted of an Environmental Audit of the existing assets and management capability around the Bank’s Performance Requirements (PRs) and an Environmental Analysis of the proposed investment programme. The ESSD has confirmed that the EBRD-funded project will not give rise to significant environmental or social impacts and can be managed in a manner which will comply with EBRD's Performance Requirements. The ESDD identified, in addition to specific risk management actions, a need to strengthen further the capacity and resources within EPS to implement the Environmental and Social Action Plan (‘ESAP’) required by the Bank to ensure that the project meets the PRs. The ESAP for this project will include, amongst other requirements, the need for EPS to develop waste management procedures for the collection, segregation, storage, and disposal of waste (including old electricity meters); improvements to the health and safety management and training of both staff and contractors; as well as development of a stakeholder engagement programme. EBRD will monitor the project to asses the status of implementation of the ESAP. EBRD's technical, environmental and procurement due diligence has been supported by an external consultant under a EUR 50,000 contract funded by the Spanish Government.

Original sector

Energy

Location

Country

Serbia

Source

Source

European Bank for Reconstruction and Development (EBRD)

URL

More Details

Record type

Project

Sector

Government, Power Generation (CCGT), Residential, Waste Processing and Treatment

Article published date

2025-07-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project