EPS Solar Strategy Phase 1
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
1 EPS Solar Strategy (Phase 1) includes three schools that will have low profile solar arrays installed in 2019. The estimated 890 kilowatts of capacity is projected to generate 990 megawatt hours of energy and offset 630 tonnes of CO2. .2 This project involves the design-build of photovoltaic generation systems on three schools: .1 Lillian Osborne High School: .1 Roof area approx. 8,361 square me
- Status
- Prospective
- Sector
- Commercial, Education, Solar, Government
- Location
- Edmonton, Alberta, Canada
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about EPS Solar Strategy Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | 1 EPS Solar Strategy (Phase 1) includes three schools that will have low profile solar arrays installed in 2019. The estimated 890 kilowatts of capacity is projected to generate 990 megawatt hours of energy and offset 630 tonnes of CO2. .2 This project involves the design-build of photovoltaic generation systems on three schools: .1 Lillian Osborne High School: .1 Roof area approx. 8,361 square meters (90,000 sq. ft.) .2 Solar array ? 450 kWdc .2 Victoria School: .1 Roof area approx. 15,124 s... |
Procurement method |
Location
Country | Canada |
State | Alberta |
City | Edmonton |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Education, Solar, Government |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Canada
- Site C Worker Accommodation
- Transport and Rescue Squadron Hangar Facility - 19 Wing CFB Comox 442
- Thornwood Residences Phase 2
- Canadian Tire Corporate Office Interior Renovation
- St. Stephen Border Crossing
- Aqsarniit Hotel and Convention Centre
- Safeway Refrigerated Warehouse
- International Brotherhood of Boilermakers Training Centre and Union Hall
