EPTA Transit Center
Sector: Power Transmission • Location: Martinsburg, West Virginia, United States of America
Source: Dodge USA
The Work of Project is defined by the Contract Documents and includes, but is not limited to, the following: 1.Site Civil: Includes the following: a.Construction of temporary fencing, erosion and sediment control measures, and temporary construction required to protect the public and adjacent properties prior to commencement of the Work. b.Complete demolition and lawful disposal of existing above
- Status
- Closed
- Sector
- Power Transmission, Government, Commercial, Power Generation (CCGT)
- Location
- Martinsburg, West Virginia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about EPTA Transit Center
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Work of Project is defined by the Contract Documents and includes, but is not limited to, the following: 1.Site Civil: Includes the following: a.Construction of temporary fencing, erosion and sediment control measures, and temporary construction required to protect the public and adjacent properties prior to commencement of the Work. b.Complete demolition and lawful disposal of existing above and below grade structures and site utilities to extent indicated. c.Preparation of site for new ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | West Virginia |
City | Martinsburg |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Government, Commercial, Power Generation (CCGT) |
Article published date | 2024-04-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- North Creek Trail Section 4-Phase 2 & 3
- Fine Arts and Housing Cooling Engineering Study
