logo

Equatorial 5, 7 and 8 Transmission Lines

Sector: Cable car • Location: Brazil

Source: World Bank Group

Project
Active

The project involves the construction of 3 transmission lines with total length of 833.9 KM in Para, Tocantis, Goias state in Brazil. The sponsor is Equatorial Energia and the SPVs are Equatorial Transmissora 5 SPE S.A. (SPV 5), Equatorial Transmissora 7 SPE S.A 9(SPV 7). and Equatorial Transmissora 8 SPE S.A (SPV ). SPV 5 entails the construction of 257-km, 500 kV Igaporã III - Janaúba 3 C2 Tra

Status
Prospective
Sector
Cable car, Power Generation (CCGT), Automotive, Commercial, Telecommunications, Government
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Equatorial 5, 7 and 8 Transmission Lines

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Equatorial 5, 7 and 8 Transmission Lines” is an infrastructure initiative in the Cable car sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project involves the construction of 3 transmission lines with total length of 833.9 KM in Para, Tocantis, Goias state in Brazil. The sponsor is Equatorial Energia and the SPVs are Equatorial Transmissora 5 SPE S.A. (SPV 5), Equatorial Transmissora 7 SPE S.A 9(SPV 7). and Equatorial Transmissora 8 SPE S.A (SPV ). SPV 5 entails the construction of 257-km, 500 kV Igaporã III - Janaúba 3 C2 Transmission Line. SPV 7 entails the construction of 56.1-km, 500 kV Vila do Conde - Marituba Transmission Line, 68.6-km, 230 kV Marituba - Castanhal - Transmission Line, 500/230 kV Marituba - (3+1R)x300 MVA substation and 230/69 kV Marituba 2x200 MVA substation. SPV 8 entails the construction of the Xingu—Altamira 230 kV ~61 km Transmission Line, the Altamira–Transamazônica 230 kV ~188 km Transmission Line, the Transamazônica–Tapajós 230 kV ~187 km Transmission Line, the 230/138- 13.8 kV (2 x 150 MVA) Tapajós Substation, the Tapajós Substation–Synchronous Compensator (-75/+150 MVAR) and the Rurópolis Substation–Synchronous Compensator (-55/+110 MVAR) The financing is via 20-year bond (debenture) issuance in the amount of BRL 385 million or $ 96 million. Equatorial Energia holds the concessions under BOT model for a period of 30 years. Financial close was reached on 23 May 2019. https://ri.equatorialenergia.com.br/enu/5327/ENGComunicado%20ao%20Mercado%20EQTL_Funding%20SPEs%205%207%20e%208%20Debentures.pdf https://ijglobal.com/data/transaction/46832/equatorial-energias-brazilian-transmission-line-portfolio-8339km https://ijglobal.com/articles/140274/brazilian-transmission-issues-debentures

Original sector

Energy

Procurement method

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Cable car, Power Generation (CCGT), Automotive, Commercial, Telecommunications, Government

Article published date

2024-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project