Equatorial 5, 7 and 8 Transmission Lines
Sector: Power Generation (CCGT) • Location: Brazil
Source: World Bank Group
The project involves the construction of 3 transmission lines with total length of 833.9 KM in Para, Tocantis, Goias state in Brazil. The sponsor is Equatorial Energia and the SPVs are Equatorial Transmissora 5 SPE S.A. (SPV 5), Equatorial Transmissora 7 SPE S.A 9(SPV 7). and Equatorial Transmissora 8 SPE S.A (SPV ). SPV 5 entails the construction of 257-km, 500 kV Igaporã III - Janaúba 3 C2 Tra
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project involves the construction of 3 transmission lines with total length of 833.9 KM in Para, Tocantis, Goias state in Brazil. The sponsor is Equatorial Energia and the SPVs are Equatorial Transmissora 5 SPE S.A. (SPV 5), Equatorial Transmissora 7 SPE S.A 9(SPV 7). and Equatorial Transmissora 8 SPE S.A (SPV ). SPV 5 entails the construction of 257-km, 500 kV Igaporã III - Janaúba 3 C2 Transmission Line. SPV 7 entails the construction of 56.1-km, 500 kV Vila do Conde - Marituba Transmission Line, 68.6-km, 230 kV Marituba - Castanhal - Transmission Line, 500/230 kV Marituba - (3+1R)x300 MVA substation and 230/69 kV Marituba 2x200 MVA substation. SPV 8 entails the construction of the Xingu—Altamira 230 kV ~61 km Transmission Line, the Altamira–Transamazônica 230 kV ~188 km Transmission Line, the Transamazônica–Tapajós 230 kV ~187 km Transmission Line, the 230/138- 13.8 kV (2 x 150 MVA) Tapajós Substation, the Tapajós Substation–Synchronous Compensator (-75/+150 MVAR) and the Rurópolis Substation–Synchronous Compensator (-55/+110 MVAR) The financing is via 20-year bond (debenture) issuance in the amount of BRL 385 million or $ 96 million. Equatorial Energia holds the concessions under BOT model for a period of 30 years. Financial close was reached on 23 May 2019. https://ri.equatorialenergia.com.br/enu/5327/ENGComunicado%20ao%20Mercado%20EQTL_Funding%20SPEs%205%207%20e%208%20Debentures.pdf https://ijglobal.com/data/transaction/46832/equatorial-energias-brazilian-transmission-line-portfolio-8339km https://ijglobal.com/articles/140274/brazilian-transmission-issues-debentures |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
