Equatorial Guinea - Basic Health Services Strengthening Project (Health - I)
Sector: Commercial • Location: Equatorial Guinea
Source: African Development Bank (AfDB)
The Basic Health Services Strengthening Project (Health - I) falls in line with the new health policy described in the PNDS, whose activities are in keeping with the Bank Group Health policy. The proposed measures should help to solve problems affecting patients at secondary and tertiary levels, to ease the congestion of patients from referral hospitals, where serious and critical cases are treate
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Basic Health Services Strengthening Project (Health - I) falls in line with the new health policy described in the PNDS, whose activities are in keeping with the Bank Group Health policy. The proposed measures should help to solve problems affecting patients at secondary and tertiary levels, to ease the congestion of patients from referral hospitals, where serious and critical cases are treated, and to strengthen the IHC (primary level) where less serious cases are treated while serious cases are referred to hospitals within a reasonable time. The expected outputs are: (i) construction of CSIs and operational facilities; (ii) training of project CSI health personnel; and (iii) rehabilitation of the Ministry's facilities assigned to the PUI. The project comprises two components. The Component I: Strengthening of Basic Health Services concerns: (i) Studies and Supervision; (ii) Construction: 8 IHCs; (iii) Equipment/furniture/supplies; and (iv) Training. The second Component comprises: Project Management: i) Rehabilitation; ii) Equipment/Furniture/Supplies; iii) Technical Assistance; iv) Audit; and v) Operations. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
