Eraring Battery Storage Project
One of 5,618 projects Taiyo tracks in New South Wales.
Source: PV Tech
A battery energy storage system located at the site of Australia's largest coal-fired power station, Eraring. The project includes a first stage of 460MW/1,770MWh with approximately 3.8 hours of discharge capability, and a second stage expected online in early 2027, bringing total capacity to 700MW/3,160MWh.
- Status
- Under Construction
- Sector
- Energy Storage, Power Generation (CCGT)
- Location
- New South Wales, Australia
- Updated
- 22 Jul 2026
- Source
- PV Tech
ConstructChat
Ask ConstructChat about Eraring Battery Storage Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A battery energy storage system located at the site of Australia's largest coal-fired power station, Eraring. The project includes a first stage of 460MW/1,770MWh with approximately 3.8 hours of discharge capability, and a second stage expected online in early 2027, bringing total capacity to 700MW/3,160MWh. |
Original sector | Energy |
Budget |
Location
Country | Australia |
State | New South Wales |
Source
Source | PV Tech |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Power Generation (CCGT) |
Article published date | 2026-04-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
