ERCIP Microgrid Construction
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
This project will install a new two-megawatt diesel generator on the JSOC compound, at Fort Liberty, NC. The existing generator controls and electrical distribution infrastructure are to be expanded to allow the new generator to be synchronized with the four existing generators. Project shall install new medium voltage transformers, switchgear, distribution cable, duct-banks, breakers, equipment f
- Status
- Closed
- Sector
- Telecommunications, Power Generation (CCGT), Commercial
- Location
- Fort Liberty, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about ERCIP Microgrid Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project will install a new two-megawatt diesel generator on the JSOC compound, at Fort Liberty, NC. The existing generator controls and electrical distribution infrastructure are to be expanded to allow the new generator to be synchronized with the four existing generators. Project shall install new medium voltage transformers, switchgear, distribution cable, duct-banks, breakers, equipment for communications and controls, a new fuel supply system consisting of fuel tanks, and a polishin... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Fort Liberty |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Telecommunications, Power Generation (CCGT), Commercial |
Article published date | 2024-08-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Telecommunications projects in United States of America
- ATLANTA STREETCAR EAST EXTENSION FROM JACKSON ST TO IRWIN ST
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- UPGRADE (E) WIRELESS TELECOMMUNICATIONS FACILITY.ADD 2 ANTENNAS ADD 3 RRU'S ADD 1 OVP SURGE PROTECTOR ADD 1 HYBRID
- INSTALLATION OF A NEW SMALL CELL WIRELESS FACILITY IN THE PUBLIC RIGHT OF WAY
- REMOVE AND REPLACE NEW WIRELESS ANTENNAS AND RELATED EQUIPMENT
- INSTALL 1 FLAGPOLE,6 ANTENNAS,1 RADOME,3 POWER CABLES,3 HYBR D CABLES,JUMPERS FROM RRUS TO ANTENNAS,NEW 10'X10'LEASE..SEE
- DISH WIRELESS COLLOCATION ONTO EXISTING WIRELESS FACILITY AND GROUND BASE STATION
- COLLOCATION OF (3)NEW ANTENNAS & ASSOCIATED CABLES & EQUIPMT PER ATTACHED SCOPE OF WORK. 6904 COMPLIANT AT&T (E)CELL SITE
