logo
ProjectClosed

ERCIP Microgrid Construction

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

This project will install a new two-megawatt diesel generator on the JSOC compound, at Fort Liberty, NC. The existing generator controls and electrical distribution infrastructure are to be expanded to allow the new generator to be synchronized with the four existing generators. Project shall install new medium voltage transformers, switchgear, distribution cable, duct-banks, breakers, equipment f

Status
Closed
Sector
Telecommunications, Power Generation (CCGT), Commercial
Location
Fort Liberty, North Carolina, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about ERCIP Microgrid Construction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “ERCIP Microgrid Construction” is an infrastructure initiative in the Telecommunications sector, located in Fort Liberty, North Carolina, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project will install a new two-megawatt diesel generator on the JSOC compound, at Fort Liberty, NC. The existing generator controls and electrical distribution infrastructure are to be expanded to allow the new generator to be synchronized with the four existing generators. Project shall install new medium voltage transformers, switchgear, distribution cable, duct-banks, breakers, equipment for communications and controls, a new fuel supply system consisting of fuel tanks, and a polishin...

Procurement method

Budget

Location

Country

United States of America (USA)

State

North Carolina

City

Fort Liberty

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Telecommunications, Power Generation (CCGT), Commercial

Article published date

2024-08-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project