ERCIP Microgrid Construction
One of 10,000+ projects Taiyo tracks in North Carolina.
Source: Dodge USA
This project will install a new two-megawatt diesel generator on the JSOC compound, at Fort Liberty, NC. The existing generator controls and electrical distribution infrastructure are to be expanded to allow the new generator to be synchronized with the four existing generators. Project shall install new medium voltage transformers, switchgear, distribution cable, duct-banks, breakers, equipment f
- Status
- Under Construction
- Sector
- Power Generation (CCGT), Telecommunications, Commercial
- Location
- Fort Liberty, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about ERCIP Microgrid Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project will install a new two-megawatt diesel generator on the JSOC compound, at Fort Liberty, NC. The existing generator controls and electrical distribution infrastructure are to be expanded to allow the new generator to be synchronized with the four existing generators. Project shall install new medium voltage transformers, switchgear, distribution cable, duct-banks, breakers, equipment for communications and controls, a new fuel supply system consisting of fuel tanks, and a polishin... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Fort Liberty |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Telecommunications, Commercial |
Article published date | 2024-07-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
