Eric Avenue Storm Water Drainage Improvements
Sector: Water Supply and Storage • Location: Onalaska, Wisconsin, United States of America
Source: Dodge USA
The Work for which Bids are asked includes the following: The proposed project will include grading approximately 920 linear feet of roadside ditches along Eric Avenue and Tower Street, installation of approximately 390 feet of 12 culverts with end sections underneath eleven (11) driveways, and reconstruction of approximately 6,080 square feet of asphalt roadway. All disturbed areas shall be resto
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Waste Processing and Treatment, Government, Commercial, Raw Materials
- Location
- Onalaska, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Eric Avenue Storm Water Drainage Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Work for which Bids are asked includes the following: The proposed project will include grading approximately 920 linear feet of roadside ditches along Eric Avenue and Tower Street, installation of approximately 390 feet of 12 culverts with end sections underneath eleven (11) driveways, and reconstruction of approximately 6,080 square feet of asphalt roadway. All disturbed areas shall be restored as a part of the project. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Onalaska |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Waste Processing and Treatment, Government, Commercial, Raw Materials |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
