Eritrea - Asmara Infrastructure Development Study
The status, timeline and source of this project. A free account opens every field.
Source: African Development Bank (AfDB)
The present project relates to the Asmara Infrastructure Development Study. It’s initiated because of the need to support the Government of Eritrea’s efforts to reconstruct and revitalise the country’s economy as a vehicle to achieve its ultimate goal of poverty alleviation and social justice. The study is aimed at formulating a strategic development plan within which such investments should be un
- Sector
- Water Supply and Storage, Government
- Location
- Eritrea
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Eritrea - Asmara Infrastructure Development Study
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The present project relates to the Asmara Infrastructure Development Study. It’s initiated because of the need to support the Government of Eritrea’s efforts to reconstruct and revitalise the country’s economy as a vehicle to achieve its ultimate goal of poverty alleviation and social justice. The study is aimed at formulating a strategic development plan within which such investments should be undertaken in Greater Asmara, it should contribute to the achievement of the country’s goals. A feasibility study to be carried out within the framework of the study should enable the Government to seek funding for the highest priority project in the urban transport sub-sector, the one sector that currently present the greatest constraints to economic interaction between Asmara and the villages surrounding it; and the water supply and sanitation sub-sector, which is presenting a major health hazard, especially in the very low-income settlements in Greater Asmara. The study should be implemented in three phases: (i) strategic Urban Development Plan, (ii) feasibility Study, and (iii) Detailed Design. |
Original sector | Other Multisector |
Budget |
Location
Country | Eritrea |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government |
Article published date | 2025-03-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Eritrea
- Eritrea - Supplementary Funding for the Groundwater Assessment, Aquifer Mapping and Well Development Project
- Eritrea - Groundwater Assessment, Aquifer Mapping and Well Development Project
- Eritrea - Dekemhare 30 MW Solar PV Project
- New Dam in Molqui Sub-zone
- ER-Ports Rehab SIL (FY98)
- Eritrea - Drought Resilience and Sustainable Livelihoods Programme V (DRSLP-V)
- Eritrea - Desert to Power - 12 MW Mini Grid Project - Tesseney Kerekebet and Barentu
- SEF Tesinma Coachbuilding Project