Eritrea - Central Highlands Irrigated Horticultural Development Project
Sector: Raw Materials • Location: Eritrea
Source: African Development Bank (AfDB)
The Central Highlands Irrigated Horticultural Development Project addresses the immediate need to support the productive sector and reduce dependence on imported food. Principally, the project should increase the output and income of small farmers in the Central Highlands of Eritrea, one of the poorest countries in the countries in the word. It aims to improve food security and increase foreign ex
- Sector
- Raw Materials, Water Supply and Storage, Government
- Location
- Eritrea
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Eritrea - Central Highlands Irrigated Horticultural Development Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Central Highlands Irrigated Horticultural Development Project addresses the immediate need to support the productive sector and reduce dependence on imported food. Principally, the project should increase the output and income of small farmers in the Central Highlands of Eritrea, one of the poorest countries in the countries in the word. It aims to improve food security and increase foreign exchange earnings through augmenting domestic food production. The main outputs are: construction of 15 small new dams to irrigate 400 ha of cultivable land; rehabilitate 31 existing earth dams covering 940 ha of downstream irrigation, pumped/gravity irrigation through 400 wells covering 800 ha of land; sustainable management of natural resources through protection of 3,573 ha of catchment areas, hill terracing, micro-basins, stone bunds and tree planting. The project comprises the following components: A) Irrigation Development Component (IDC), B) Agricultural Development Component (ADC) and C) Project Coordination and Monitoring Unit Component (PCMU). |
Original sector | Agriculture, Forestry, Fishing |
Budget |
Location
Country | Eritrea |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Water Supply and Storage, Government |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Raw Materials projects in Eritrea
- Eritrea - National Livestock Development Project (NLDP)
- Eritrea - Enable Youth Eritrea
- Eritrea - Fisheries Infrastructure Development Project
- Eritrea - Drought Resilience and Sustainable Livelihoods Program
- Eritrea - Drought Resilience and Sustainable Livelihoods Programme V (DRSLP-V)
- Eritrea - Dekemhare 30 MW Solar PV Project
- New Dam in Molqui Sub-zone
- MARINE DEVELOPMENT
