logo
ProjectBid Results

Erosion Control Measures

Bid results · Mississippi · Last reported Oct 2024

Source: Dodge USA

Erosion Control Measures on St. Paul Church Lane located in Section 34, Township 8N, Range 20E, Lawrence County, MS.

Status
Closed
Sector
Commercial, Road, Government, Manufacturing (Industrial)
Location
Silver Creek, Mississippi, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Erosion Control Measures

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Erosion Control Measures” is an infrastructure initiative in the Commercial sector, located in Silver Creek, Mississippi, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bid Results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Erosion Control Measures on St. Paul Church Lane located in Section 34, Township 8N, Range 20E, Lawrence County, MS.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Mississippi

City

Silver Creek

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Road, Government, Manufacturing (Industrial)

Article published date

2024-11-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project