Erosion Control Stabilization
Notice of completion · Illinois · Last reported Jul 2023
Source: Dodge USA
Installation of 300 linear feet of rip rap for erosion control stabilization along the Fox River. This work will include 275 cu yd of earth excavation, 300 ft of stone riprap, class A4, 420 sq yd of filter fabric, 164 sq yd of erosion control blanket, (DS-75), 390 ft of temporary fence, stream protection and dewatering of the construction site, and other miscellaneous items of work.
- Status
- Closed
- Sector
- Commercial, Manufacturing (Industrial), Government
- Location
- Fox River Grove, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Erosion Control Stabilization
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Notice of Completion |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Installation of 300 linear feet of rip rap for erosion control stabilization along the Fox River. This work will include 275 cu yd of earth excavation, 300 ft of stone riprap, class A4, 420 sq yd of filter fabric, 164 sq yd of erosion control blanket, (DS-75), 390 ft of temporary fence, stream protection and dewatering of the construction site, and other miscellaneous items of work. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Fox River Grove |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Manufacturing (Industrial), Government |
Article published date | 2023-07-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
