logo

Erosion Prevention

Sector: Water Supply and Storage • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Completed

Project will place new riprap bank protection and replace existing sheeting on the bridge conveyance pinchpoints to provide protection and prevent erosion from peak flows generated from intense stormwater discharge from upstream areas. The placing of fill and rock protection to repair eroded areas and protect embankments has been noted in our most recent bridge inspection reports and will ensure s

Project Information FAQ

Project Information

4 Q
The project “Erosion Prevention” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Project will place new riprap bank protection and replace existing sheeting on the bridge conveyance pinchpoints to provide protection and prevent erosion from peak flows generated from intense stormwater discharge from upstream areas. The placing of fill and rock protection to repair eroded areas and protect embankments has been noted in our most recent bridge inspection reports and will ensure safe and effective conveyance of peak flows during storm events. It is listed as a critical priority for our municipality. This project will improve stormwater conveyance and provide safety around the existing bridge conveyance constraint. The scope of this project will avoid bank erosion/collapse and will mitigate the generation of stormwater flow obstacles, and provide bank stabilization and erosion contol. This work will enhance the conveyance system for many years and specifically address the safe flowthrough of peak storm water flows.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data