logo

ERSA Small Hydroelectric Power Project

Sector: Water Supply and Storage • Location: Brazil

Source: World Bank Group

Project
Active

In May 2008, Empresa de Investimento em Energias Renovaveis SA (ERSA) began constructing Cocais Grande, the first of ten Pequenas Centrais Hidreletricas (PCH’s) - Small Hydroelectric Power Plants, in the states of Minas Gerais and Santa Catarina. The total package consisted of the following facilities: 7.5-MW Varzea Alegre, 9-MW Varginha, 10-MW Ninho da Aguia, 10-MW Cocais Grande, 11-MW Sao Gonçal

Status
Prospective
Sector
Water Supply and Storage, Hydro, Power Generation (CCGT), Government, Commercial
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about ERSA Small Hydroelectric Power Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “ERSA Small Hydroelectric Power Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In May 2008, Empresa de Investimento em Energias Renovaveis SA (ERSA) began constructing Cocais Grande, the first of ten Pequenas Centrais Hidreletricas (PCH’s) - Small Hydroelectric Power Plants, in the states of Minas Gerais and Santa Catarina. The total package consisted of the following facilities: 7.5-MW Varzea Alegre, 9-MW Varginha, 10-MW Ninho da Aguia, 10-MW Cocais Grande, 11-MW Sao Gonçalo, 13-MW Arvoredo, 14-MW Corrente Grande, 18-MW Aiuruoca, 21.5-MW Paiol and 23-MW Barra da Paciencia. The projects were held by 10 special purpose entities, which were in turn held by PCH Holding SA, a direct subsidiary of ERSA. In Brazil, PCH’s are exempt from concession law and therefore no tendering was conducted after approval by the federal electricity regulator Aneel. PCH’s also enjoyed special tax incentives from Brazil’s government including: 100% tax exemption for certain power generation tariffs such as the Public Asset Use (UBP) and Financial Compensation for the Use of Water Resources (CFURH) and the Research and Development ( R&D) charges as well as a 50% exemption on the tariff of Use of the Distribution System (TUSD). The total project cost was estimated at R$ 774.2 million (US $423.1 million). In November 2008, Brazil’s national development bank BNDES approved a R$ 471.5 million (US $231.2 million) loan to implement the projects. Drawdown on the debt was given to blocks of projects based on their stage of completion. PCH Holding SA was created to hold the funds from the BNDES loan and then disperse it to each of the ten special purpose entities. Cocais Grande, the first PCH, was expected to become operational in 1Q 2009. The remaining nine facilities were expected to become operational in 2010. The funding included transmission lines which were to connect the power plants to the national energy grid. Figures were converted to USD based on the market rate, period average for 2008 published by the IMF. Operations commenced in each power plant in the following dates: * In March 2009, PCH Cocais Grande; * In March 2010, PCH Paiol; * In April 2010, PCH Arvoredo; * In June 2010, PCH Sao Goncalo; * In October 2010, PCH Varginha; * In January 2011, PCH Ninho da Aguia; * In February 2011, PCH Corrente Grande; * In March 2011, PCH Barra da Paciência; and * In April 2011, PCH Várzea Alegre. In April 2011, ERSA entered into a partnership with CPFL Energia to merge the generating assets of the two companies and to transfer the ownership and management of these assets to a newly created company called CPFL Renovaveis. CPFL Energia was set to maintain 63.6% of this new company's shares, while ERSA's shareholders would maintain 36.4%). Figures were converted to USD based on the market rate, period average for 2008 published by the IMF.

Original sector

Energy

Procurement method

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Hydro, Power Generation (CCGT), Government, Commercial

Article published date

2024-09-27

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project