ERTAN HYDRO
Sector: Water Supply and Storage • Location: China
Source: World Bank Group
The main objectives of the Ertan Hydroelectric Project are to : i) provide additional generation capacity to the power system in Sichuan province in order to alleviate an acute electricity shortage; ii) assist in the transfer of modern power technology and in the introduction of efficient dam construction methods to reduce the prevailing long gestation periods of hydropower projects; iii) contribu
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Hydro, Government
- Location
- China
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about ERTAN HYDRO
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The main objectives of the Ertan Hydroelectric Project are to : i) provide additional generation capacity to the power system in Sichuan province in order to alleviate an acute electricity shortage; ii) assist in the transfer of modern power technology and in the introduction of efficient dam construction methods to reduce the prevailing long gestation periods of hydropower projects; iii) contribute to further improvements in the analysis of environmental and ecological impacts of hydroelectric resource development; iv) enhance the institutional development of Ertan Hydroelectric Development Corporation (EHDC); and v) provide technical assistance in project design and implementation. The project components include : 1) preparatory works; 2) construction of a parabolic, double-curvature arch dam (240 m high) across the Yalong River together with an underground powerhouse complex, a log conveyance system, and appurtenant works and structures; 3) provision and installation of six 550MW generating units and associated equipment; 4) resettlement of 30,000 people; 5) an environmental management program and science station; 6) consultant's services for engineering, procurement, management of construction; 7) studies of power pricing and power plant and reservoir operation; and 8) strengthening EHDC's organization, technical assistance and staff training. |
Original sector | Energy and Extractives |
Budget |
Location
Country | China |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Hydro, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in China
- Yangjiang Nuclear Power Plant Guangdong Province
- Shidao Bay Nuclear Power Plant
- Sanmen Nuclear Power Plant Zhejiang Province
- Baihetan Hydropower Project China
- The Ertan China Hydropower Plant Project
- Yebatan Hydropower Project
- Qinshan Nuclear Power Plant Haiyan County Zhejiang
- Lingao Nuclear Power Station Guangdong
