logo

ERTAN HYDRO

Sector: Water Supply and Storage • Location: China

Source: World Bank Group

Project
Closed

The main objectives of the Ertan Hydroelectric Project are to : i) provide additional generation capacity to the power system in Sichuan province in order to alleviate an acute electricity shortage; ii) assist in the transfer of modern power technology and in the introduction of efficient dam construction methods to reduce the prevailing long gestation periods of hydropower projects; iii) contribu

Project Information FAQ

Project Information

5 Q
The project “ERTAN HYDRO” is an infrastructure initiative in the Water Supply and Storage sector, located in China. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The main objectives of the Ertan Hydroelectric Project are to : i) provide additional generation capacity to the power system in Sichuan province in order to alleviate an acute electricity shortage; ii) assist in the transfer of modern power technology and in the introduction of efficient dam construction methods to reduce the prevailing long gestation periods of hydropower projects; iii) contribute to further improvements in the analysis of environmental and ecological impacts of hydroelectric resource development; iv) enhance the institutional development of Ertan Hydroelectric Development Corporation (EHDC); and v) provide technical assistance in project design and implementation. The project components include : 1) preparatory works; 2) construction of a parabolic, double-curvature arch dam (240 m high) across the Yalong River together with an underground powerhouse complex, a log conveyance system, and appurtenant works and structures; 3) provision and installation of six 550MW generating units and associated equipment; 4) resettlement of 30,000 people; 5) an environmental management program and science station; 6) consultant's services for engineering, procurement, management of construction; 7) studies of power pricing and power plant and reservoir operation; and 8) strengthening EHDC's organization, technical assistance and staff training.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data