logo
ProjectClosed

ERTAN HYDRO

Sector: Water Supply and Storage • Location: China

Source: World Bank Group

The main objectives of the Ertan Hydroelectric Project are to : i) provide additional generation capacity to the power system in Sichuan province in order to alleviate an acute electricity shortage; ii) assist in the transfer of modern power technology and in the introduction of efficient dam construction methods to reduce the prevailing long gestation periods of hydropower projects; iii) contribu

Status
Closed
Sector
Water Supply and Storage, Power Generation (CCGT), Hydro, Government
Location
China
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about ERTAN HYDRO

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “ERTAN HYDRO” is an infrastructure initiative in the Water Supply and Storage sector, located in China. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The main objectives of the Ertan Hydroelectric Project are to : i) provide additional generation capacity to the power system in Sichuan province in order to alleviate an acute electricity shortage; ii) assist in the transfer of modern power technology and in the introduction of efficient dam construction methods to reduce the prevailing long gestation periods of hydropower projects; iii) contribute to further improvements in the analysis of environmental and ecological impacts of hydroelectric resource development; iv) enhance the institutional development of Ertan Hydroelectric Development Corporation (EHDC); and v) provide technical assistance in project design and implementation. The project components include : 1) preparatory works; 2) construction of a parabolic, double-curvature arch dam (240 m high) across the Yalong River together with an underground powerhouse complex, a log conveyance system, and appurtenant works and structures; 3) provision and installation of six 550MW generating units and associated equipment; 4) resettlement of 30,000 people; 5) an environmental management program and science station; 6) consultant's services for engineering, procurement, management of construction; 7) studies of power pricing and power plant and reservoir operation; and 8) strengthening EHDC's organization, technical assistance and staff training.

Original sector

Energy and Extractives

Budget

Location

Country

China

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Hydro, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project