Erzurum and Nevsehir Hydroelectric Plants Project

Sector: Hydro • Location: Turkey

Source: World Bank Group

Project
Active

On March 4 2008, Soyak Group subsidiary Senerji En. Ür. A.S. signed the 11-year-term agreement for a US$ 230 million loan from the Turkish Akbank to finance two hydroelectricity power plants (HEPPs) near the cities of Erzurum and Nevsehir. Senerji would use the loan for construction and operation of 82.5 MW Erzurum Güllübag Dam and HEPP on Coruh river near the city of Erzurum in Southeast Turkey.

Project Information FAQ

Project Information

5 Q
The project “Erzurum and Nevsehir Hydroelectric Plants Project” is an infrastructure initiative in the Hydro sector, located in Turkey. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

On March 4 2008, Soyak Group subsidiary Senerji En. Ür. A.S. signed the 11-year-term agreement for a US$ 230 million loan from the Turkish Akbank to finance two hydroelectricity power plants (HEPPs) near the cities of Erzurum and Nevsehir. Senerji would use the loan for construction and operation of 82.5 MW Erzurum Güllübag Dam and HEPP on Coruh river near the city of Erzurum in Southeast Turkey. The company obtained a 49-year generation license from the Energy Market Regulatory Authority (EMRA) as of January 11, 2007 for that plant. Senerji would also use the loan proceeds for the construction and operation of a 67 MW Nevsehir Bayramhacili HEPP for which it obtained a 35-year generation license as of January 20, 2006. Nevsehir Bayramhacili Dam and HEPP were to be built on Kizilirmak river near Nevsehir in the Central Anatolia Region. The loan, priced at around 200bp, would mature in 11 years and would have a grace period of 3.5 years. Akbank would extend the facility in several installments throughout the course of the project. Construction was already under way thanks to a US$50 million bridge loan also from Akbank.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data