Escolha Thermal Power Plant

Sector: Geothermal • Location: Brazil

Source: World Bank Group

Project
Cancelled

The Brazilian company Energetica Capixaba S.A., a partnership of the Brazilian companies Thermes (33.3%) and Trana Construcoes (66.7%), was granted an authorization to build the 337.6-MW thermoelectric power plant (natural gas) named UTE Escolha located in the state of Espirito Santo. The 35-year contract was signed with the regulatory agency ANEEL in April 2009.

Energetica Capixaba S.A. committe

Project Information FAQ

Project Information

4 Q
The project “Escolha Thermal Power Plant” is an infrastructure initiative in the Geothermal sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

cancelled

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Brazilian company Energetica Capixaba S.A., a partnership of the Brazilian companies Thermes (33.3%) and Trana Construcoes (66.7%), was granted an authorization to build the 337.6-MW thermoelectric power plant (natural gas) named UTE Escolha located in the state of Espirito Santo. The 35-year contract was signed with the regulatory agency ANEEL in April 2009. Energetica Capixaba S.A. committed to invest US$ 528.4 million (BRL 862.4 million). In May 2011, the company signed a loan contract with SUDENE (the Brazilian northeastern region development agency) worth US$ 316.8 million (BRL 517 million). The remaining investment cost was set to be financed with the sponsor resources and other funding. The company won the bidding for purchase power agreements to sell the electricity to the grid starting in 2013. Construction works were underway, as of August 2011. Due to delays in the implementation of the project, the regulatory agency cancelled the concession contract in December 2012 and applied the due penalties.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data