Escondida Organic Growth Project 1, Chile

Sector: Chemical (Industrial) • Location: Chile

Source: Bechtel

Project
Close

Escondida Organic Growth Project 1,Maintaining copper output at over 1 million metric tons per year

With the forecast of increasing copper production for the Escondida mine, the construction of Organic Growth Project 1 (known as OGP1) was approved in 2012 to replace the Los Colorados concentrator, delivering additional processing capacity and allowing access to high-grade ore. BHP partnered wit

Project Information FAQ

Project Information

4 Q
The project “Escondida Organic Growth Project 1, Chile” is an infrastructure initiative in the Chemical (Industrial) sector, located in Chile. Taiyo aggregates data on it from Bechtel.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Close

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Escondida Organic Growth Project 1,Maintaining copper output at over 1 million metric tons per year With the forecast of increasing copper production for the Escondida mine, the construction of Organic Growth Project 1 (known as OGP1) was approved in 2012 to replace the Los Colorados concentrator, delivering additional processing capacity and allowing access to high-grade ore. BHP partnered with Bechtel to execute Organic Growth Project 1, continuing the companies’ long-term partnership at Escondida. With capacity of 152,000 metric tons per day, Organic Growth Project 1 is the largest single-line unit ever built. While executing a project at an elevation in excess of 10,000 feet (3,100 meters) in one of the world’s driest deserts presented many difficulties, Bechtel was up to the challenge. Image gallery The new concentrator project included four ball mills, four sets of hydrocyclones, a coarse ore handling system, a pebble crushing circuit, concentrate and tailings thickeners, and modifications to Escondida's power and water supply systems. Although the project required 60 million job hours and involved 9,200 people during peak construction, Bechtel and BHP managed to complete it with an outstanding safety record. With the start of operations at Organic Growth Project 1 in 2016, Escondida was able to begin operating three concentrators simultaneously, boosting overall throughput capacity to 422,000 metric tonnes per day, higher than any other mine. This offset a natural decline in ore grades, maintaining average production capacity at the world’s largest copper mine at approximately 1.2 million metric tons per year. In 2016, Escondida was awarded the National Mining Society Award in the Large Producer category for its position as a leader in Chilean copper production and for the start of operations at Organic Growth Project 1. Since beginning operations in 1990, Escondida has increased its processing capacity by more than 10 times and its copper production has almost quadrupled. Santiago Hub streamlines study and execution phases Just like in Brisbane, Bechtel and BHP established the Santiago Hub in order to have a specific execution model in Chile. However, while the Brisbane center focused on multiple metallurgical coal projects, the Santiago Hub was utilized solely to plan and execute expansions of Escondida.     The multi-year Hub model enabled Bechtel and our customer to collaborate and align on a planned long-term arrangement for the most effective delivery in terms of budget, schedule, safety and quality improvements, and risk reduction during construction. This innovative solution was also utilized for the Oxide Leach Area Pad and Escondida Water Supply projects at the world’s largest copper mine. The latter, a 2,500-liter per second seawater desalination plant, also began operating in 2016. In order to provide an alternative water supply to Escondida’s three copper concentrators, the facility is the second desalination plant at Coloso Port.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Medium

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data