Escondida Organic Growth Project 1, Chile
One of 3,492 projects Taiyo tracks in Chile.
Source: Bechtel
Escondida Organic Growth Project 1,Maintaining copper output at over 1 million metric tons per year
With the forecast of increasing copper production for the Escondida mine, the construction of Organic Growth Project 1 (known as OGP1) was approved in 2012 to replace the Los Colorados concentrator, delivering additional processing capacity and allowing access to high-grade ore. BHP partnered wit
- Status
- Closed
- Sector
- Chemical (Industrial), Metal, Power Generation (CCGT), Seaport, Waste Processing and Treatment, Water Supply and Storage, Power Transmission, Manufacturing (Industrial)
- Location
- Chile
- Updated
- 22 Jul 2026
- Source
- Bechtel
ConstructChat
Ask ConstructChat about Escondida Organic Growth Project 1, Chile
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | Close |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Escondida Organic Growth Project 1,Maintaining copper output at over 1 million metric tons per year With the forecast of increasing copper production for the Escondida mine, the construction of Organic Growth Project 1 (known as OGP1) was approved in 2012 to replace the Los Colorados concentrator, delivering additional processing capacity and allowing access to high-grade ore. BHP partnered with Bechtel to execute Organic Growth Project 1, continuing the companies’ long-term partnership at Escondida. With capacity of 152,000 metric tons per day, Organic Growth Project 1 is the largest single-line unit ever built. While executing a project at an elevation in excess of 10,000 feet (3,100 meters) in one of the world’s driest deserts presented many difficulties, Bechtel was up to the challenge. Image gallery The new concentrator project included four ball mills, four sets of hydrocyclones, a coarse ore handling system, a pebble crushing circuit, concentrate and tailings thickeners, and modifications to Escondida's power and water supply systems. Although the project required 60 million job hours and involved 9,200 people during peak construction, Bechtel and BHP managed to complete it with an outstanding safety record. With the start of operations at Organic Growth Project 1 in 2016, Escondida was able to begin operating three concentrators simultaneously, boosting overall throughput capacity to 422,000 metric tonnes per day, higher than any other mine. This offset a natural decline in ore grades, maintaining average production capacity at the world’s largest copper mine at approximately 1.2 million metric tons per year. In 2016, Escondida was awarded the National Mining Society Award in the Large Producer category for its position as a leader in Chilean copper production and for the start of operations at Organic Growth Project 1. Since beginning operations in 1990, Escondida has increased its processing capacity by more than 10 times and its copper production has almost quadrupled. Santiago Hub streamlines study and execution phases Just like in Brisbane, Bechtel and BHP established the Santiago Hub in order to have a specific execution model in Chile. However, while the Brisbane center focused on multiple metallurgical coal projects, the Santiago Hub was utilized solely to plan and execute expansions of Escondida. The multi-year Hub model enabled Bechtel and our customer to collaborate and align on a planned long-term arrangement for the most effective delivery in terms of budget, schedule, safety and quality improvements, and risk reduction during construction. This innovative solution was also utilized for the Oxide Leach Area Pad and Escondida Water Supply projects at the world’s largest copper mine. The latter, a 2,500-liter per second seawater desalination plant, also began operating in 2016. In order to provide an alternative water supply to Escondida’s three copper concentrators, the facility is the second desalination plant at Coloso Port. |
Location
Country | Chile |
Source
Source reliability | Medium |
Source | Bechtel |
URL |
More Details
Record type | Project |
Sector | Chemical (Industrial), Metal, Power Generation (CCGT), Seaport, Waste Processing and Treatment, Water Supply and Storage, Power Transmission, Manufacturing (Industrial) |
Article published date | 2023-05-13 |
Research
Free account
View all details