Escuela Nueva Tower Mixed Use Development
Closed · Texas · Last reported Mar 2025
Source: Dodge
8 story mixed use tower. 114 affordable units Level 1 Montessori School & GNDC Office, classrooms, support areas for the level and building with concrete structure. Levels 2-8 will consist of multifamily units with load bearing metal stud/truss structure. All trades will be needed including but not limited to: Site Work; Structural Concrete; Load Bearing Metal Framing; MEP trades; Glass & Glazing;
- Status
- Closed
- Sector
- Metal, Education, Cement, Commercial, Residential
- Location
- Austin, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Escuela Nueva Tower Mixed Use Development
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 8 story mixed use tower. 114 affordable units Level 1 Montessori School & GNDC Office, classrooms, support areas for the level and building with concrete structure. Levels 2-8 will consist of multifamily units with load bearing metal stud/truss structure. All trades will be needed including but not limited to: Site Work; Structural Concrete; Load Bearing Metal Framing; MEP trades; Glass & Glazing; Finishes; and Cleaning. Please bid per plans and specifications. Framing type contains both CONC... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Austin |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Metal, Education, Cement, Commercial, Residential |
Article published date | 2025-03-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
