ESD Davis Field Accessibility Upgrades
Sector: Power Generation (CCGT) • Location: Elma, Washington, United States of America
Source: Dodge
The objective of this project is to enhance accessibility and safety at Davis Field in Elma, WA, by installing a 160-foot-long by 10-foot-wide ramp, complete with retaining walls and integrated stairs. Miscellaneous metals will include handrails and a flagpole. Utility work will include storm drainage and conduits to support future electric and communication wiring. A small concrete plaza will be
- Status
- Closed
- Sector
- Power Generation (CCGT), Road, Cement, Education, Power Transmission, Metal, Government, Commercial, Seaport, Waste Processing and Treatment
- Location
- Elma, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about ESD Davis Field Accessibility Upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The objective of this project is to enhance accessibility and safety at Davis Field in Elma, WA, by installing a 160-foot-long by 10-foot-wide ramp, complete with retaining walls and integrated stairs. Miscellaneous metals will include handrails and a flagpole. Utility work will include storm drainage and conduits to support future electric and communication wiring. A small concrete plaza will be installed to attach to existing walk surfaces. This infrastructure improvement aims to provide eq... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Elma |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Road, Cement, Education, Power Transmission, Metal, Government, Commercial, Seaport, Waste Processing and Treatment |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
