logo

ESGC Phase 1 Maintenance Building

Sector: Power Transmission • Location: Defuniak Springs, Florida, United States of America

Source: Dodge

Project
Gc Bidding

The proposed project, hereinafter referred to as the Project consists of the construction of a maintenance building at the Eagle Springs Golf Course Complex. The base bid includes all building materials and construction, utility hookups, and site grading. Bid alternates include the interior build-out (Alternate 1) and access/parking lot paving (Alternate 2).

Status
Prospective
Sector
Power Transmission, Manufacturing (Industrial), Power Generation (CCGT), Car parking, Automotive, Commercial, Cement, Government
Location
Defuniak Springs, Florida, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about ESGC Phase 1 Maintenance Building

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “ESGC Phase 1 Maintenance Building” is an infrastructure initiative in the Power Transmission sector, located in Defuniak Springs, Florida, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

gc bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed project, hereinafter referred to as the Project consists of the construction of a maintenance building at the Eagle Springs Golf Course Complex. The base bid includes all building materials and construction, utility hookups, and site grading. Bid alternates include the interior build-out (Alternate 1) and access/parking lot paving (Alternate 2).

Procurement method

Budget

Location

Country

United States of America (USA)

State

Florida

City

Defuniak Springs

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Power Transmission, Manufacturing (Industrial), Power Generation (CCGT), Car parking, Automotive, Commercial, Cement, Government

Article published date

2025-07-14

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project