logo
ProjectClosed

ESID BCC Housing / Faye Architectes & Associes

One of 10,000+ projects Taiyo tracks in France.

Source: ArchDaily

The project therefore has obvious readability of its functions. The entrance hall is located at the connection between the different flows, at the center of the project. On the other hand, the simple diagram makes it possible to prioritize and make transparent all the circulation and functions of the project.The plan of two built volumes and a freer core meeting the needs of the living areas is ve

Status
Closed
Sector
Cement, Residential, Commercial
Location
France
Updated
22 Jul 2026
Source
ArchDaily

ConstructChat

Ask ConstructChat about ESID BCC Housing / Faye Architectes & Associes

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “ESID BCC Housing / Faye Architectes & Associes” is an infrastructure initiative in the Cement sector, located in France. Taiyo aggregates data on it from ArchDaily.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project therefore has obvious readability of its functions. The entrance hall is located at the connection between the different flows, at the center of the project. On the other hand, the simple diagram makes it possible to prioritize and make transparent all the circulation and functions of the project.The plan of two built volumes and a freer core meeting the needs of the living areas is very functional, its distribution clear, and simple, while responding precisely to the needs expressed by the program.The built volumes correspond to the habitat. Between, qualifying the void, the circulation and technical parts are found there, allowing easy access to the different aisles.The architectural bias is to maintain simple volumes, where the quality of the project comes from the landscaped interstitial spaces, and the interior quality of the rooms, without denying the aesthetics of the concrete.The logic of registration on the site takes up the footprint of existing buildings. This layout makes it possible to fit into the base diagram, without coming into contradiction with the whole and the full-empty diagram.The program of 100 identical rooms in 2 sets of buildings leads us to offer the prefabrication of identical modules for built volumes. The duplication of a simple reference block thus establishes the heart of the project. The use of concrete offers intrinsic qualities of durability, solidity, and aesthetics, responding efficiently to the functional needs linked to the particular use of residential premises.Text description provided by the architects.Located on military base 120 in Cazaux, the architecture of this new ensemble allows us to work on the relationships between volumes through the void... what qualities, what programs, and what uses we wish to give to the “empty”. It is this definition of intermediate spaces which brings new uses and a quality of living to a simple program, over short periods of time, where the collective takes precedence.The very regular context establishes the identity of the military system. All the buildings on the base are built on the ground floor or R+1, the objective is not to upset the general harmony ordered by the whole.

Location

Country

France

Source

Source

ArchDaily

URL

More Details

Record type

Project

Sector

Cement, Residential, Commercial

Article published date

2025-06-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project