logo
ProjectPlanned

Eskom Transmission Development Plan Expansion

The owner, status and timeline of this project. A free account opens every field.

Source: Business LIVE

South Africa is undertaking one of the largest infrastructure buildouts in its history to expand the electricity transmission backbone by 50% in little more than 10 years. The plan includes about 14,500 km of new high-voltage lines and 133,000 MVA of additional transformer capacity, adding more than 40% to the grid, with a projected investment requirement of roughly R440 billion. The project aims

Status
Prospective
Sector
Power Transmission, Power Generation (CCGT), Government
Location
South Africa
Updated
19 Nov 2026
Source
Business LIVE

ConstructChat

Ask ConstructChat about Eskom Transmission Development Plan Expansion

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Eskom Transmission Development Plan Expansion” is an infrastructure initiative in the Power Transmission sector, located in South Africa. Taiyo aggregates data on it from Business LIVE.

Participants

Sponsoring Agency

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

South Africa is undertaking one of the largest infrastructure buildouts in its history to expand the electricity transmission backbone by 50% in little more than 10 years. The plan includes about 14,500 km of new high-voltage lines and 133,000 MVA of additional transformer capacity, adding more than 40% to the grid, with a projected investment requirement of roughly R440 billion. The project aims to address transmission capacity constraints to enable new power supply to meet demand, particularly for renewable energy uptake.

Original sector

Energy

Budget

Location

Country

South Africa

Source

Source

Business LIVE

URL

More Details

Record type

Project

Sector

Power Transmission, Power Generation (CCGT), Government

Article published date

2025-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project