logo

Espy Avenue Elevated Water Tank

Sector: Water Supply and Storage • Location: Pass Christian, Mississippi, United States of America

Source: Dodge USA

Project
Bid Results

Construction of a 500,000 gallon single pedestal elevated tank and associated site work. Extension of a 12-inch and 16-inch water main and connection to Harrison County Utility Authority s water system and 12-inch water main and connection to City of Pass Christian s water system. Installation of gravel driveway and erosion control/vegetative restoration.

Status
Closed
Sector
Water Supply and Storage, Commercial, Government, Consumer Products, Waste Processing and Treatment, Road, Power Transmission, Power Generation (CCGT)
Location
Pass Christian, Mississippi, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Espy Avenue Elevated Water Tank

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Espy Avenue Elevated Water Tank” is an infrastructure initiative in the Water Supply and Storage sector, located in Pass Christian, Mississippi, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bid Results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Construction of a 500,000 gallon single pedestal elevated tank and associated site work. Extension of a 12-inch and 16-inch water main and connection to Harrison County Utility Authority s water system and 12-inch water main and connection to City of Pass Christian s water system. Installation of gravel driveway and erosion control/vegetative restoration.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Mississippi

City

Pass Christian

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Commercial, Government, Consumer Products, Waste Processing and Treatment, Road, Power Transmission, Power Generation (CCGT)

Article published date

2024-12-09

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project