logo
ProjectActive

Essar Bulk Terminal Ltd

Sector: Water Supply and Storage • Location: India

Source: World Bank Group

Essar Bulk Terminal Ltd was the SPV of Essar Ports & Terminals Ltd, a subsdiary of Essar Group, to build and operate an all-weather deep-draft port at Hazira in India capable of handling up to 105,000 dwt bulk carriers to import iron ore, pellets, coal, limestone, etc. and export finished steel products. Construction started in Jan 2009 and commissioning in Jul 2009. Essar Ports & Terminals Ltd i

Status
Prospective
Sector
Water Supply and Storage, Steel, Metal, Warehouse, Seaport, Government, Manufacturing (Industrial), Commercial
Location
India
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Essar Bulk Terminal Ltd

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Essar Bulk Terminal Ltd” is an infrastructure initiative in the Water Supply and Storage sector, located in India. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Essar Bulk Terminal Ltd was the SPV of Essar Ports & Terminals Ltd, a subsdiary of Essar Group, to build and operate an all-weather deep-draft port at Hazira in India capable of handling up to 105,000 dwt bulk carriers to import iron ore, pellets, coal, limestone, etc. and export finished steel products. Construction started in Jan 2009 and commissioning in Jul 2009. Essar Ports & Terminals Ltd is the sponsor and Essar Bulk Terminal Ltd is the borrower. Essar Construction Ltd is the EPC contractor. The cost of first phase of the project (30 MTPA Dry Bulk / General Cargo)was estimated to be Rs13.5 billion (US$279 million) with a debt equity ratio of 74/26, according to the project sponsor. Other sources suchas as deallogic indicate a proejct cost of US$160 million. The project reached financial closure on 8 Jun 2009 with a debt/Equity ratio of 66/34. Financing comprises a Rs5.12bn 11-year term loan and Rs2.625bn equity. Axis Bank is the lead arranger. The cost of second phase of the project (20 MTPA General Cargo Terminal expansion) was estimated to be INR8.5 billion (US$186 million) and financial closure was reached in 2010. The second phase expec to be operation by 2012.

Original sector

Transport

Budget

Location

Country

India

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Steel, Metal, Warehouse, Seaport, Government, Manufacturing (Industrial), Commercial

Article published date

2024-09-27

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project